Adil Khan 1 year ago
AdiKhanOfficial #FYP Ideas

Single phase grid tie inverter

Power generation through grid tie inverter is one of the economic and environmental friendly way. These inverters tied to the grid to feed energy to national power grid i-e WAPDA or KESC etc. Using existing infrastructure and also to homes which makes them financially efficient. Grid tie inve

Project Title

Single phase grid tie inverter

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

Power generation through grid tie inverter is one of the economic and environmental friendly way. These inverters tied to the grid to feed energy to national power grid i-e WAPDA or KESC etc. Using existing infrastructure and also to homes which makes them financially efficient.

Grid tie inverter which convert DC power into AC power have the ability to synchronize for interfacing to the utility lines. It's required to match the frequency, phase and voltage of inverter to that grid so that they can synchronize to provide energy to the grid.

Project Objectives

1- Getting pure sine wave at the output of grid tie inverter.

2- Synchronization of inverter output and grid.

Project Implementation Method

1- To do literature survey.

2- To simulate the circuit.

3- To test the simulation of circuit.

4- To design hardware circuit.

5- To test the hardware working.

Benefits of the Project

1- Project based on renewable energy resources which in itself is useful and helpful not only for overcoming the energy crisis but also being environmental friendly.

2- Ability to supply electricity not only to the users but to grid as well.

3- It contains own generation and distribution to the grid which eliminates the use of electricity of grid and saving bills.

Technical Details of Final Deliverable

Final deliverable is working hardware and report of the project in the report following points are covered.

1- Introduce

2- Literature survey

3- Research methodology and analysis

4- Design or theoretical framework

5- Implementation and results

6- Conclusion

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Energy

Other Industries

Others

Core Technology

Others

Other Technologies

Shared Economy

Sustainable Development Goals

Affordable and Clean Energy

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Controller Equipment120002000
Driver transfer Equipment125002500
Switching circuit board Equipment190009000
Power transformer Equipment110001000
Main circuit board Equipment140004000
Synchronize circuit Equipment155005500
Total in (Rs) 24000
If you need this project, please contact me on contact@adikhanofficial.com
0
127
Book | Essentials Of Business Communication 9th edition

1675638330.png
Adil Khan
7 years ago
Human Arthritis Analysis and Prediction using Non Invasive Sensors

  Under the JPMA study, there was only one cross-sectional study, by Khalil et al., W...

1675638330.png
Adil Khan
1 year ago
Life Shades Hospira

Life Shades Hospira aims at developing a web based system that is both doctor patient appo...

1675638330.png
Adil Khan
1 year ago
E Banking

E-Banking is web-based Banking. Now a day due to emerging global economy, e-commerceand e-...

1675638330.png
Adil Khan
1 year ago
Socially Aware Smart Robot

Assalam O Alikum. Following is the summary of our project: We are going to build a machine...

1675638330.png
Adil Khan
1 year ago