Adil Khan 10 months ago
AdiKhanOfficial #FYP Ideas

Moveable Road Barrier

The main purpose of this project is to reduce inconvenience of people due to traffic congestion by providing a feasible solution through product design that will work as a "defense mechanism" against the traffic congestion. Research shows that every country is facing the traffic congestion pr

Project Title

Moveable Road Barrier

Project Area of Specialization

Robotics

Project Summary

The main purpose of this project is to reduce inconvenience of people due to traffic congestion by providing a feasible solution through product design that will work as a "defense mechanism" against the traffic congestion.

Research shows that every country is facing the traffic congestion problem and the rate of increase of the specific problem is increasing at quite a higher rate. this problem costs heavily to every country and the effect on individual s terrible (as it affects mental health of the one travelling on road).

the problem is vast, and people are in dire need of such a solution that helps to have a smooth flow of traffic and let people save their time and cut their extra cost of travelling.

I am designing such a product that will allow to use the existing road more efficiently. It is a common observation that many times, the flow of traffic is such that the traffic is only on one side (incoming) of the road and the other half (on going) is not occupied much. in such a case, the designed product will achieve the purpose of varying/extending the road width when and where it is required. The product will move from one place to another place according to requirement. the extension in road will help the traffic to flow smoothly thus getting rid of the incontinence caused by traffic congestion.

Project Objectives

The primary objective is to achieve a product which can safely vary the width of road, temporarily, according to the requirement (i.e. increase /decrease the width when desired).

Secondly, I want to utilize the existing resources at optimum level. I am focusing on making changes and improvements to existing resources (roads) instead of making new roads/infrastructure trough efficient methods to save time, energy and resources.

Project Implementation Method

Permission will be required from Ministry of traffic since the controlling body of the product will be traffic police. The product will be installed in the place of median strip or where the road barriers are already used.

Benefits of the Project

Benefits:

Time-saving

Cost efficient (will be responsible for saving resources such as fuel)

Better health, better individual since it will be a source of reducing the stress of individual which will have positive impact on both physical and mental health

Better environment, better planet as it will reduce the time hence it will reduce the exhaust emissions of vehicles which will have a better impact on plants

Technical Details of Final Deliverable

The size of my prototype is 100 cm in length, 40 cm width, 82 cm height. The components I am using in my design are as follow:

Steel body chssis

Rubber composite coating on the outer body

Four obstacle sensors

Four small DC motors

Four wheels

Four actuators

Breaking system

Led strip Light 

Flasher

Reflector sticker

Battery

Control Unit

Signal receiver and sender

Solar panel

Wires to make connections

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Transportation

Other Industries

Core Technology

Robotics

Other Technologies

Sustainable Development Goals

Decent Work and Economic Growth, Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
wheel Equipment48003200
obstacle sensor Equipment420008000
DC motor Equipment420008000
break pads Equipment415006000
LED light strip Equipment140004000
Steel Equipment170007000
reflector sticker Equipment310003000
battery Equipment150005000
flasher Equipment1800800
printed circuit board Equipment230006000
rubber Equipment140004000
wires Equipment120002000
solar panel Equipment180008000
traveling to market Miscellaneous 105005000
hired craftsmen Miscellaneous 510005000
switch Equipment82001600
Total in (Rs) 76600
If you need this project, please contact me on contact@adikhanofficial.com
Alpha Lab With Brain Tumor Detection

Brain Tumor segmentation is one of the most crucial and arduous tasks in the terrain of me...

1675638330.png
Adil Khan
10 months ago
Hybrid UPS based on Supercapacitor Energy Storage and Adjustable Speed...

Uninterruptible Power Supply (UPS) is used to guarantee the reliability of backup power. C...

1675638330.png
Adil Khan
10 months ago
Real Time Facial Mask Detection Using Machine Learning

COVID-19 is a kind of coronavirus that has made its way into our country Pakistan made the...

1675638330.png
Adil Khan
10 months ago
Smart Power Strip Home Automation by Bringing outlets into the IoT

Smart power strip is a power strip that is control by the  controller  and can t...

1675638330.png
Adil Khan
10 months ago
Solar Hybrid Power System

Solar Hybrid Power System is a multi-mode power system which can simultaneously manage inp...

1675638330.png
Adil Khan
10 months ago