Adil Khan 1 year ago
AdiKhanOfficial #FYP Ideas

Automatic Control of AC and DC using PLC with backup system

Our project is to automatically switching power sources (WAPDA, Solar) using PLC and to power up the load along with charging of battery and this battery will be used as a backup in case when no source is available. For switching sources, PLC Ladder diagram is used. AC or DC loads can be used at loa

Project Title

Automatic Control of AC and DC using PLC with backup system

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

Our project is to automatically switching power sources (WAPDA, Solar) using PLC and to power up the load along with charging of battery and this battery will be used as a backup in case when no source is available. For switching sources, PLC Ladder diagram is used. AC or DC loads can be used at load side.

Project Objectives

The main aim of our project is to automatically switching power sources (WAPDA, Solar) using PLC and to power up the load along with charging of battery and this battery will be used as a backup in case when no source is available. For switching sources, PLC Ladder diagram is used. AC or DC loads can be used at load side.

Project Implementation Method

  • Ladder Diagram for programming of PLC according to our project.
  • Sources (Wapda and Solar Panel) are being switched by using PLC.
  • To get the 24V DC for input of PLC, Boost Converter is being used after the Solar Panel.
  • Charging system for battery charging from PLC output is designed.
     

Benefits of the Project

As our project is using PLC and switching of sources using PLC is not being done in industry. This project will provide benefit in order to cater the problem of voltage regulation at load side and makes industry work smoothly as there is also a back-up system if all sources are off. This project provides efficient and fast way for switching and operating.

Technical Details of Final Deliverable

PLC is main component in this project to control the sources and to make the sources give constant and stable input to PLC converters are used and at load side there is charging circuit and for that if output voltages greater than battery voltage level then it will charge.

At the end we will be having a stable system of switching between sources alongwith a battery backup system.

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Energy

Other Industries

Core Technology

Others

Other Technologies

Sustainable Development Goals

Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
PLC Equipment11300013000
Solar Panel Equipment150005000
Electronic Components Miscellaneous 170007000
Battery Equipment130003000
Total in (Rs) 28000
If you need this project, please contact me on contact@adikhanofficial.com
0
145
Design and Implementation of Energy Harvesting System from Gym Exercis...

   Pakistan is facing power shortage. The aim of this project is to generate...

1675638330.png
Adil Khan
1 year ago
HK budget

Budgeting is a challenge for many people. While many folks want to reel in spending, it ca...

1675638330.png
Adil Khan
1 year ago
Furniture hub

  Our project is about virtual selling and purchasing of furniture from different soc...

1675638330.png
Adil Khan
1 year ago
Life Of Force Shooting Game Unity

Unity 3d Game  Project Objectives (less than 2500 characters)

1675638330.png
Adil Khan
1 year ago
Metro Train Transport Management System by using PLC & SCADA

Metros had been designed to divert some traffic of big cities from roads to the railway tr...

1675638330.png
Adil Khan
1 year ago