Project Title

Automated Fortification and Smart Monitoring of Distribution Transformer

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

Distribution Transformers (DTs) are essential part of WAPDA's distribution system.They are affected due to overloading,phase unbalancing and internal hydration which result in overheating and short circuit and eventually they are decayed.In summer due to much overloading, the number of burnt transformers incease and a lot of money is required in workshops for their reclamation.Therefore,as we have a protection system for power transformers we must have a protection and a monitoring system for DTs to avoid a burden on our economy.For this purpose we are prepairing a prototype for DTs automatic protection from above mention affects and also an IoT based monitoring system for their quick replacement before they are decayed.The proposed prototype will protect the transformer from overloading,overheating and will cool it too with the help of fans.The measured parameters will be sent to a web based server after every 15 seconds for transformer monitoring whether it is working in normal condition or a critical condition.Hence in last which is a main thing i.e we will have a data stored which will help us to enhance our research in this field and bring more enhancements and advanced systems for power distribution with very low power losses and hence an ever green Pakistan.

Project Objectives

Our aim is to develop and implement an IoT based system for smart monitoring and automated protection of distribution transformer. This system will surmount the following objectives:

1. Measure the temperature and humidity of DT along with the voltage and current for all three phases.  

2. Real time transmission of monitored values on a web-based server using GPRS.  

3. Real time Protection against over voltage, over current and high temperature.  

4. Storage and GUI based visualization of data at control room.  

Project Implementation Method

  • Simulations of the proposed prototype will be made using proteus software.After the completion of simululatios prototype will be made.???????
  • Proposed prototype will be assembled using a Distribution Transformer to which a device will be connected on load side for monitoring its parameters i.e. current, humidity and temperature.
  • Readings will be sent to a controller having built in Wi-Fi module for transmission of data to the server. Further accessories will be attached for the cooling purpose such as fans.
  • There will be an intelligent mechanism in the controller for the protection of DT from overloading such as logical tripping of phases.
  • For instant protection cut off relays will be there.
  • Data for the efficiency of the proposed system will be analyzed using server.
  • Server will save the data after very few seconds i.e. 15sec. 

Benefits of the Project

  • The real time data stored at the server will help us to visualize and analyze the graphs.
  • These graphs are the results which will let us know about the efficiency of both transformer and the device connected for it’s protection.
  • We can utilize these results for replacement of a decaying transformer or with little changings in device for the protection of other electrical machines. 
  • Stored data at server will help us to enhance research in Power Distribution.

Technical Details of Final Deliverable

  1. A device for distribution transformer with a lot of features built in such as it's protection from overcurrent,overvoltage and high temperature.
  2. Very less or no man power is required because a proposed protection system is an automatic system.
  3. 24 hours monitoring of measured parameters for analyzing it's performance.
  4. A quick replacement of transformer is an additional option on the bases of real time data which will be monitored in a control room with the help of GPRS.
  5. The measured data will be stored after every 15 seconds with which we will analyze further enhancements and hence opportunity of research will increase for advanced systems.

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Others

Other Industries

IT , Manufacturing , Telecommunication

Core Technology

Internet of Things (IoT)

Other Technologies

Cloud Infrastructure

Sustainable Development Goals

Decent Work and Economic Growth, Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Three phase Distribution Transformer Equipment11500015000
Diodes Equipment10550
Resistors Equipment10550
Zener Diodes Equipment10550
Arduino UNO Equipment27001400
Web Server Equipment120002000
Capacitors Equipment1010100
Temperature and humidity sensors Equipment150005000
Current Transformer Equipment3650019500
Potential Transformer Equipment320006000
Fast Trip Relay Equipment11680016800
Pro Signal Thermometer Equipment1350350
Current Voltmeter Tester Equipment137003700
Hard Board Miscellaneous 1500500
PCB Layout Miscellaneous 210002000
Cutting pliers Miscellaneous 2200400
Screw Drivers Miscellaneous 250100
Drills Miscellaneous 110001000
Nuts Miscellaneous 205100
Total in (Rs) 74100
If you need this project, please contact me on contact@adikhanofficial.com
Home Security System

For a country to be economically strong, it must ensure a safe and secure environment for...

1675638330.png
Adil Khan
10 months ago
Waste to Fuel: Briquette Manufacturing using Sugar Mill Waste

Fuel briquette machine is made for the recycling of Biomass. Pakistan has a great potentia...

1675638330.png
Adil Khan
10 months ago
Thermal competence of Innovative (splayed Type) heat sinks

Heat dissipation techniques are the prime concern to remove the waste heat produced by Ele...

1675638330.png
Adil Khan
10 months ago
SUCM Alumni management system

This proposed project entitled ?SUCM Alumni Management System? entails the monitoring of t...

1675638330.png
Adil Khan
10 months ago
Business Communication Lecture No 1

1675638330.png
Adil Khan
7 years ago