Task Management System
It is a web and mobile based application by which an organization can assign and manage their tasks among its employees. On the basis of assign task employer can evalaute the employee performance and compute their KPIs.
| Project Title |
Task Management System
| Project Area of Specialization |
Computer Science | | Project Summary |
It is a web and mobile based application by which an organization can assign and manage their tasks among its employees. On the basis of assign task employer can evalaute the employee performance and compute their KPIs. | | Project Objectives |
- To monitor the performance of academic and non academic staff.
- To identify the key performance indicator KPI of employees
- To enhanced the faculty performance.
| | Project Implementation Method |
Project implementation method: We will implement our project through waterfall model. Phases of implemented method as follows: - Requirement gathering and Analysis: All possible requirements of the system to be developed are captured in this phase and documented in a requirement specification document.
- System Design: The requirement specifications from first phase are studied in this phase and the system design is prepared. This system design helps in specifying hardware and system requirements and helps in defining the overall system architecture.
- Coding / Implementation: With inputs from the system design, the system is first developed in small programs called units, which are integrated in the next phase. Each unit is developed and tested for its functionality, which is referred to as Unit Testing.
- Integration and Testing: All the units developed in the implementation phase are integrated into a system after testing of each unit. Post integration the entire system is tested for any faults and failures.
- Deployment of system: Once the functional and non-functional testing is done; the product is deployed in the live environment.
| | Benefits of the Project |
1- Assigned task to employees. 2- Track the task history. 3- Monitor the performance of employees. | | Technical Details of Final Deliverable |
- Complete Working Software / Application
- Source Code
- Software Documentation
- User Manual
| | Final Deliverable of the Project |
Software System | | Core Industry |
IT | | Other Industries |
Others | | Core Technology |
Clean Tech | | Other Technologies |
Others | | Sustainable Development Goals |
Good Health and Well-Being for People, Gender Equality | Required Resources
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
| Web Hosting | Miscellaneous | 1 | 5000 | 5000 |
| Domain | Miscellaneous | 1 | 3000 | 3000 |
| Printing | Miscellaneous | 1 | 2000 | 2000 |
| | | Total in (Rs) | 10000 |