Now a days the increase of electricity bill rates the consumer are facing problem in payment due to the over range bills .the power factor improving method can save their unit as a result the low amount of bill can be achieved         &nbs

Project Title

single phase power factor correction

Project Area of Specialization

Wearables and Implantable

Project Summary

Now a days the increase of electricity bill rates the consumer are facing problem in payment due to the over range bills .the power factor improving method can save their unit as a result the low amount of bill can be achieved

                                               In real world, utilities normally only require a power factor of 0.9 wasted energy capacity, also known as poor power factor. The lower your power factor, the less economically your system operates although a unity power factor provide the most efficient power system.

                                                      In addition harmonic problem can be introduced if the capacitor is              not sized. The primary benefit of power factor correction is the elimination of charges related to reactive power consumption power will net saving. In addition, power factor correction will improve the overall performance of the power system

Project Objectives

  • To reduce electricity bills
  • To overcome extre power consumption
  • For application realibilty
  • For proper power supply stability
  • Using on large scale can very helpful to overcome on loadshadiing

Project Implementation Method

While using electricity we can connect power factor device parallel to the electric supply which is coming from the supplier company .So that power consumption can be detected by power factor

device .In power factor  device the capacitor and synchronous motor react as the capacitive power

when inductor load increased. The capacitor banks connect is parallel to each other with synchrous motor help to maintain power factor rating between 0.96 to 0.99the screen is also

Connected which is telling user current situation of power factor.   

Benefits of the Project

1) It can save bill extra charges

2) It is benefical for reducing units

(KWH)

3) Reducing units direct save money cost

4) Increased system capacity and reduced losses in your electricity system

Technical Details of Final Deliverable

  • It increase the effiency of applications
  • It can reduce the load from the power plant.  apply on large scale.
  •      It is easy to install and require one time investment.

Final Deliverable of the Project

Hardware System

Type of Industry

Energy

Technologies

Wearables and Implantables

Sustainable Development Goals

Affordable and Clean Energy

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Single Phase Power Capacitor bank Equipment5200010000
Thyristor switches Equipment65003000
Detuned reactor Equipment63001800
Body Frame Equipment150005000
Power switch Equipment63502100
Synchronous motor Equipment6350021000
Automatic power controller Equipment11000010000
Wiring Equipment130003000
Maintenance Cost Miscellaneous 120002000
Installation Cost Equipment130003000
Other Equipments Equipment135003500
Total in (Rs) 64400
If you need this project, please contact me on contact@adikhanofficial.com
IoT Based Tunnel Farming

As population is growing, there is a dire need&nbs...

1675638330.png
Adil Khan
10 months ago
Clean Pakistan

Waste management is one of the primary problems that the world faces irrespective of the c...

1675638330.png
Adil Khan
10 months ago
Car Parking System using QR code

This project offers an android based reservation system where users can view various parki...

1675638330.png
Adil Khan
10 months ago
Greenhouse monitoring system using Wireless Sensor Network

Over recent years, the interest for vegetables and fruits in all seasons and places has mu...

1675638330.png
Adil Khan
10 months ago
Designing a Data Acquisition System Using Labview

The purpose of this project is to design a data acquisition system using Labview software....

1675638330.png
Adil Khan
10 months ago