RFID Based Warehouse Management system

And all the inventory is being managed manually which is a way slow and imperfect solution for the inventory in warehouses. Barcodes have to be implemented manually and there are a lot complications with them. Our goal is made the warehouses management system way smarter a

2025-06-28 16:28:58 - Adil Khan

Project Title

RFID Based Warehouse Management system

Project Area of Specialization Computer ScienceProject Summary

And all the inventory is being managed manually which is a way slow and imperfect solution for the inventory in warehouses.

Our goal is made the warehouses management system way smarter and more efficient than old method by using RFID tags, scanners and desktop application for inventory. In this approach all the products, pallets and storage Bins will be tagged by RFID tags. Whenever the stock will enter the warehouse it will be automatically detected  by the Scanners and will send all the stocks’ information to inventory application which will make stock management and tracking a lot easier in useful manners.

Project Objectives Project Implementation Method

Use of IOT and Desktop application for inventory management.

We have different parts in our project

1-Desktop App:

All the information about the products and stock is stored in the RFID tags and is collected by the scanners and then that information is send to the inventory desktop application. There are some categories in the application like product details stock management, Bin management, Customers details, sales and purchases, which are managed through the application.

2-Hardware module:

We are using RFID tags applied to the all the management areas like products, pallets, Bins, shelves and the information is added to their memory. RFID scanners are placed from where the products will be added or moved; scanners will automatically detect the tags and send information to the inventory.

Benefits of the Project Technical Details of Final Deliverable

Requirements

Analysis

Design

Coding

Testing

Operations

Month 1

Month 2

Month 3

Month 4

Month 5 & 6

Month 7 & 8

Month 9

Month 10

Research

Model Design & Development

Model Evaluation

Hardware Components

Model Verification

Hardware Assembling

Design & Code interface

Hardware integration

Design & Code System

Hardware Connectivity

System Testing

System Verification

Requirements

Month 1

Month 2

Month 3

Research

Model Design & Development

Model Evaluation

Hardware Components

Final Deliverable of the Project HW/SW integrated systemCore Industry TransportationOther Industries Finance Core Technology Internet of Things (IoT)Other Technologies Big DataSustainable Development Goals Decent Work and Economic GrowthRequired Resources
Elapsed time in (days or weeks or month or quarter) since start of the project Milestone Deliverable
Month 1ResearchRequirements and details
Month 2Model Design and Development Desktop Application
Month 3Model Evaluation &Hardware ComponentsResults of evaluation and hardware
Month 4Model Verification Verified Model
Month 5Hardware AssemblingHardware connectivity
Month 6Design & Code interfaceImplemented Design
Month 7Hardware integrationConnectivity with Application
Month 8Design & Code SystemImplemented System
Month 9System TestingResults of testing
Month 10System Verification Verified System

More Posts