Real-time Traffic Management and Vehicle Number Plate Detection
Project Area of Specialization Artificial IntelligenceProject SummaryCurrently, we daily listen news of accident on road due to voilation of traffic rules and regulations. As a human it is impossible to continuously monitor the traffic and rememorize them. So, we are going to solve this problem. In our project basically we will make a system that will continuously monitor the traffic and check all the traffic rules. If someone will voilate the traffic rules then our system will detect it all information using its vehicle registration number and alert that person two times by displaying all it information on some screen fit on roads to warn it. If it exceed limit then automatically challan will be created and send to toll plaza to collect from it when he will leave the road. In this way we will make traffic rules and regulation applicable to public. Another aim of our project is to manage records of all vehicles coming inside university.
Project ObjectivesThe main purpose of our project is that we are going to make such system that not only monitor the traffic rules on the road but also the main feature of our project is accuracy. Because the existing systems accuracy is not really good. The accuracy of these system is less than 60%. Another reason is that there is no such system is available that monitors the traffic on the motorway or the long route roads.so we are going to deploy that system because the number of road accidents is increasing day by day due to violation of traffic rules.so by implementing that system the public will follow the traffic rules and the number of road accidents is decreasing automatically.
Project Implementation MethodThe main purpose of our project is that we are going to make such system that not only monitor the traffic rules on the road but also the main feature of our project is accuracy. Because the existing systems accuracy is not really good. The accuracy of these system is less than 60%. Another reason is that there is no such system is available that monitors the traffic on the motorway or the long route roads.so we are going to deploy that system because the number of road accidents is increasing day by day due to violation of traffic rules.so by implementing that system the public will follow the traffic rules and the number of road accidents is decreasing automatically.
Benefits of the Project- Traffic rules and regulation will be implemented and monitor live on the roads.
- Accident rate will be decreased.
- This system will make surety of challan payment.
- Our system will make ensure that traffic rules are followed.
- This system can also help to catch some vehicles involved in criminal activities etc.
- Smoothness of traffic will be increase on road due implementation of traffic rules forcefully by this system.
- All vehicles inside university or coming one will be recorded in our database.
| Project Name | Real-time Traffic Management and Vehicle Number Plate Detection |
| Project Id |
| Project Manager |
| Project Status |
| Serial No. | Deliverables | Date Accepted | Contingencies or Conditions |
| 1 | Proposal | 08/11/2020 | Project Introduction, Project Objectives, Problem Statement, Proposed Solution should be completed and submitted on time. |
| 2 | Project Overview and Introduction | 11/12/2020 | Background Studies, Scope and System Components should be completed and submitted on time. |
| 3 | Requirements Analysis | 17/12/2020 | Functional Requirements, External interface Requirements and Use Cases should be completed and submitted on time. |
| 4 | UML Diagrams | 02/01/2020 | Use Case Diagram, Class Diagram, Sequence Diagrams, Activity Diagram, Component Diagram, System Component Diagram, Package Diagram, Deployment Diagram, State Machine Diagram, ER Diagram, Deployment Diagram should be completed and submitted on time |
| 5 | Design | 24/02/2020 | |
| 6 | Documentation | 28/02/2020 | |
| 7 | Development | 15/04/2020 | |
| 8 | Testing | 25/04/2020 | Test environment and code. Errors identification should be done carefully |
| 9 | Debugging | 25/05/2020 | All bugs and errors should be removed carefully. |
| 10 | Code Review | 06/01/2020 | Review the whole system and take necessary actions if required |
Project Name
Project Id
Project Manager
Project Status
Serial No.
1
2
3
4
5
6
7
8
9
10
Final Deliverable of the Project HW/SW integrated systemCore Industry TransportationOther Industries IT Core Technology Artificial Intelligence(AI)Other Technologies Big DataSustainable Development Goals Peace and Justice Strong InstitutionsRequired Resources| Project Id |