Adil Khan 10 months ago
AdiKhanOfficial #FYP Ideas

MapIT

?MapIT? is an android based application along with a web portal. This project is specifically designed for organizations having a core functionality of tracking the passengers of the organization to ensure their safety and security. The application

Project Title

MapIT

Project Area of Specialization

Software Engineering

Project Summary

MapIT” is an android based application along with a web portal. This project is specifically designed for organizations having a core functionality of tracking the passengers of the organization to ensure their safety and security.

The application will display the real-time location of the passenger to the organization admin and parents. Also, in any case of emergencies such as route deviation from a defined route and battery alerts, the alerts will be generated and sent to the organization and parents.

Project Objectives

Following are the objectives of our MapIT System:

  • To enable the organization and the parents to track the bus location.
  • Allow the driver to view the passenger’s attendance through the application.
  • To keep and save the Passengers’ attendance records in any case of emergencies.
  • to make an application that will be able to generate the notifications to the parents and organizations in case of any route deviation from a certain threshold value.
  • To allow the passenger, admins, and drivers to get all the details of the routes and the deviation from the threshold value on the google map.
  • To generate the alert to the organization’s Admin when the driver’s and passengers’ phone goes off. 

Project Implementation Method

The Waterfall technique is being used because it is the most straightforward way to manage a project. We opted to employ the waterfall process paradigm since it best meets our client's expectations. Aside from that, as compared to other techniques, this methodology is simple to grasp, making it popular among teams with less design expertise. Before proceeding to the next step, each stage must be accomplished.

Benefits of the Project

Following are the benefits of our Project:

  1. it is specifically designed for organizations to ensure the safety of their people as it is a non-generic application.
  2. It will help the organizations or any educational institutes to keep the real-time track of their employees or students respectively
  3. it will also let the parents and organizations know if any emergency happened
  4. it will reduce the paperwork for the organizations and make the whole system automated
  5. there will be no blame game happening in case of any emergency 

Technical Details of Final Deliverable

The primary goal of this project is to create an intelligent system that tracks the vehicle and its passengers in real-time. The application will be able to produce notifications in response to certain events. The technologies we will use to develop this system are:

  • Front-End Programming Language: React Native
  • Back-End Programming Language: NodeJS

Other than languages, we will utilize Google Map APIs as we are working on Global Positioning System (GPS). We will create an algorithm to produce alerts on route deviation by vehicle-based on the threshold value and email them to the organizations based on our requirements.
Also, we will use different React Native Packages to generate notifications for the low mobile battery.

Our mission is to develop a system that helps the organization and the parents, to track the passenger and make sure to avoid any hazardous event from occurring. 

Final Deliverable of the Project

Software System

Core Industry

Security

Other Industries

Core Technology

Others

Other Technologies

Sustainable Development Goals

Sustainable Cities and Communities, Peace and Justice Strong Institutions

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Twilio Email API (for notification) Equipment191800014001
Google Map Geolocation Equipment4200003066
Google Map Geocoding API Equipment300013000
Google Map API Equipment300013000
Google Play Store app upload Equipment480014800
Printing Miscellaneous 40052000
Total in (Rs) 29867
If you need this project, please contact me on contact@adikhanofficial.com
0
136
Smart Monitoring and controlling of Industrial air compressor

Project Summary: Manipulating a compressed air in industry is strenuous for engineers. I...

1675638330.png
Adil Khan
10 months ago
Deep Learning Based Autonomous Gun with real time UAV detection and tr...

The main aim of the proposed project is to design and implement a real-time drone det...

1675638330.png
Adil Khan
10 months ago
QAU Air Pollution Monitoring System

QAU Air Pollution Monitoring system is an IOT base project. Air pollution is a growing iss...

1675638330.png
Adil Khan
10 months ago
Development of Neuro-fuzzy Controller for Alcohol Separation From Aque...

The project aims to solve the local Sugar industry problem of ethanol-water separation at...

1675638330.png
Adil Khan
10 months ago
blood bank management system for Jamila sultana foundation

Blood banks collect, store, and provide blood. Typically, these banks collect blood from v...

1675638330.png
Adil Khan
10 months ago