Designing & construction of PID controller trainer board for laboratory
PID control system is used to observe the behaviour of flowing liquid, temperature, pressure and takes action on it and fix the error of outputs. PID controllers are implemented primarily for the purpose of holding measured process value at the set point or desired value. This project is for practic
2025-06-28 16:26:37 - Adil Khan
Designing & construction of PID controller trainer board for laboratory
Project Area of Specialization Electrical/Electronic EngineeringProject SummaryPID control system is used to observe the behaviour of flowing liquid, temperature, pressure and takes action on it and fix the error of outputs. PID controllers are implemented primarily for the purpose of holding measured process value at the set point or desired value. This project is for practical purpose and can be used in future as a lab apparatus. It helps upcoming students to understand PID control system easily as they can perform PID controller labs physically.
Project ObjectivesThe main objectives of PID trainer board are following.
1. PID system evaluates the feedback variable using a fixed point to generate an error signal.
2. Provides an automation industrial system.
3. It Helps students to perform labs on PID controller trainer board.
Project Implementation Method 1. Purpose 2. Background 3. Project definition Objectives Method of approach Milestones Scope 4. Project Organisation Structure/Work Breakdown Structure 5. Project budget 6. Risk register 7. Project control 8. Stakeholder analysis Benefits of the Project- The P Controller stabilizes the gain but produces a constant steady-state error.
- The I Controller reduces or eliminates the steady-state error.
- The D Controller reduces the rate of change of error.
A PID controller isĀ an instrument used in industrial control applications to regulate temperature, flow, pressure, speed and other process variables. PID (proportional integral derivative) controllers use a control loop feedback mechanism to control process variables and are the most accurate and stable controller.
Final Deliverable of the Project Hardware SystemCore Industry EducationOther IndustriesCore Technology OthersOther TechnologiesSustainable Development Goals Quality EducationRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 35000 | |||
| Pressure Sensor: Manometer Direct Reading, Strain Gauge Level Sensor: | Equipment | 1 | 35000 | 35000 |