Design and simulation of Distributed Generation System Based on Renewable Energy Resources

Electricity has become the most essential part of our lives. The human of 21st century is surrounded by electronic gadgets and appliances. It has stimulated advancements in all fields, elevating the quality of life. In the present day all the technical development is possible through electricity. It

2025-06-28 16:31:54 - Adil Khan

Project Title

Design and simulation of Distributed Generation System Based on Renewable Energy Resources

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

Electricity has become the most essential part of our lives. The human of 21st century is surrounded by electronic gadgets and appliances. It has stimulated advancements in all fields, elevating the quality of life. In the present day all the technical development is possible through electricity. It is an established fact that the more consumption of electricity a country has, the better is their standard of living as

The demand of electricity is ever growing and is predicted to increase further in the future. New sources of electricity are added in the already present ones. So, the electric grid expansion and need of installing more generation power plants has become one of the most important topics of today. These grids are capable of production of electricity from various sources of energy. Distributed Generation (DG) can be used to cater the increasing energy requirements .

DG engages small scale energy sources near to the end where it would be consumed.

With the increasing energy demand, it has become necessary to employ small-scale distributed generators to different power generation sources and merge the power in one stream. Distributed generation is widely being used so the theme of this project is to automate the existing manual synchronization of a Distributed Energy Resource (DER) to the Main grid. These devices are already being used in our country but they are not manufactured in Pakistan rather they are imported from other countries and are very costly, so our main objective is a cost efficient device.

Project Objectives

This project has the following objectives:

Project Implementation Method

The following are the four requirements of synchronization:

1. Phase Sequence

2. Voltage Magnitude

3. Frequency

4. Phase Angle

to acheive the synchronization we are using Phase Lock Loop (PLL)  method

Benefits of the Project

One of the main benifit of this project is to utilize renewable recources and to implement the concept of Distribution Generation (DG) and reverse metering(add on).

Technical Details of Final Deliverable

our project is technically 80% completed and we have assembled all the components after sucessful simulation. few final touches and small part of PLL aurdino code is pending.

Final Deliverable of the Project HW/SW integrated systemCore Industry Energy Other IndustriesCore Technology OthersOther TechnologiesSustainable Development Goals Affordable and Clean Energy, Industry, Innovation and Infrastructure, Climate ActionRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 51249
Transformer steup up Equipment11000010000
Transformer steup down Equipment225005000
IC Equipment44501800
solar panel Equipment11200012000
battery Equipment175997599
charge controller Equipment11050010500
aurdino Equipment110001000
capacitors Equipment1050500
resistors Equipment530150
diode Equipment530150
filter Equipment1450450
wod board Miscellaneous 1300300
printing Miscellaneous 1010100
PCB Equipment1600600
Led Equipment1200200
stationary Miscellaneous 3030900