Automation based power transmission control station by using PLC and SCADA

Electric power transmission is the bulk movement of electrical energy from a generating site, such as a power plant, to an electrical substation. The interconnected lines which facilitate this movement are known as a transmission network. This is distinct from the local wiring between high-voltage s

2025-06-28 16:25:28 - Adil Khan

Project Title

Automation based power transmission control station by using PLC and SCADA

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

Electric power transmission is the bulk movement of electrical energy from a generating site, such as a power plant, to an electrical substation. The interconnected lines which facilitate this movement are known as a transmission network. This is distinct from the local wiring between high-voltage substations and customers, which is typically referred to as electric power distribution. The combined transmission and distribution network is part of electricity delivery, known as the electrical grid.
Smaller power systems are also found in industry, hospitals, commercial buildings, and homes. A single line diagram helps to represent this whole system. The majority of these systems rely upon three-phase AC power—the standard for large-scale power transmission and distribution across the modern world. Specialized power systems that do not always rely upon three-phase AC power are found in aircraft, electric rail systems, ocean liners, submarines, and automobiles.
SCADA based system is employed for proper functioning of individual systems and also for the coordination between them. In these processes there is a dedicated PLC that performs data logging and control operations. Important concept of SCADA based systems is that each system can function independent of each other and hence other systems can be shut of when not in use

Project Objectives Project Implementation Method

This work is a big challenge for us, As testing is an integral component of the development process. The primary goal of testing is to identify all the defects and errors in the hardware & software. We're going to be initiating this phase from 2nd May of 2022

Benefits of the Project Technical Details of Final Deliverable

ØThe combination of telemetry and data acquisition is referred as SCADA.

Programmable Logic Controller (PLC) are designed for multiple analogue and digital inputs and output arrangements.

Functionality of PLC include sequential relay control, process control, distributed control systems and networking.

Intelligent Electronic Devices (IED) are used for communications protocols for working together as a system to perform power-system automation.

Final Deliverable of the Project HW/SW integrated systemCore Industry Energy Other IndustriesCore Technology Cloud InfrastructureOther TechnologiesSustainable Development Goals Industry, Innovation and InfrastructureRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 79069
PLC Equipment13000030000
Human Machine Interface (HMI) Equipment11700017000
Industrial Plug (3 phase female) Equipment128002800
Converter (4-20 MILLI-AMPS) Equipment333339999
Magnetic Contactor (20 AMPS 24 V DC) Equipment48503400
Thesis Binding Miscellaneous 320006000
Project Poster Miscellaneous 123002300
Phase Indicator Equipment390270
Wires And cables Miscellaneous 115001500
Panel Equipment158005800