Automatic Control of AC and DC using PLC with backup system

Our project is to automatically switching power sources (WAPDA, Solar) using PLC and to power up the load along with charging of battery and this battery will be used as a backup in case when no source is available. For switching sources, PLC Ladder diagram is used. AC or DC loads can be used at loa

2025-06-28 16:25:18 - Adil Khan

Project Title

Automatic Control of AC and DC using PLC with backup system

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

Our project is to automatically switching power sources (WAPDA, Solar) using PLC and to power up the load along with charging of battery and this battery will be used as a backup in case when no source is available. For switching sources, PLC Ladder diagram is used. AC or DC loads can be used at load side.

Project Objectives

The main aim of our project is to automatically switching power sources (WAPDA, Solar) using PLC and to power up the load along with charging of battery and this battery will be used as a backup in case when no source is available. For switching sources, PLC Ladder diagram is used. AC or DC loads can be used at load side.

Project Implementation Method Benefits of the Project

As our project is using PLC and switching of sources using PLC is not being done in industry. This project will provide benefit in order to cater the problem of voltage regulation at load side and makes industry work smoothly as there is also a back-up system if all sources are off. This project provides efficient and fast way for switching and operating.

Technical Details of Final Deliverable

PLC is main component in this project to control the sources and to make the sources give constant and stable input to PLC converters are used and at load side there is charging circuit and for that if output voltages greater than battery voltage level then it will charge.

At the end we will be having a stable system of switching between sources alongwith a battery backup system.

Final Deliverable of the Project HW/SW integrated systemCore Industry Energy Other IndustriesCore Technology OthersOther TechnologiesSustainable Development Goals Industry, Innovation and InfrastructureRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 28000
PLC Equipment11300013000
Solar Panel Equipment150005000
Electronic Components Miscellaneous 170007000
Battery Equipment130003000