Utilization of indigenous Natural gas resources of Balochistan to Liquified petroleum gas using HYSYS simulation.

The raising demand of liquefied natural gas (LNG) in many countries showed increasing concern to investigate serveral possible routes of converaion of natural gas to LNG. The conversion of natural gas to LNG through stimulation method has always been considered a vital tool to access necessary plant

Project Title

Utilization of indigenous Natural gas resources of Balochistan to Liquified petroleum gas using HYSYS simulation.

Project Area of Specialization

Information & Communication Technology

Project Summary

The raising demand of liquefied natural gas (LNG) in many countries showed increasing concern to investigate serveral possible routes of converaion of natural gas to LNG. The conversion of natural gas to LNG through stimulation method has always been considered a vital tool to access necessary plant design equipment requirments and pre-feasibility analysis.  Simulation techniques such as process development in HYSYS v12 software are always helpful to study process parameters and optimize production. In this project, process natural gas data from gas fields located in Balochistan provience will be collected. The gas field selected for this project is PPL and OGDCL located in Dera Bugti region of Balochistan. The data will then be simulated in HYSYS software to access conversion into LNG. Among various LNG routes, two process will be simulated and analyzed. The significant process variable will be tested and analyzed. Optimization of the process variables to maximize production. This study provides first time simulation of real plant data to examine and explore production of LNG. The data will be shared with PPL and OGDCL for further process development and analysis.

Project Objectives

  1. To study and examine various routes for the conversion of natural gas to liquefied natural gas.
  2. To simulate two conversion methods in HYSYS simulation.
  3. To study and optimize conversion methods with significant process variables.

Project Implementation Method

This project will be implemented in 10 phases over a time span of 6 months.

Phase#1: Real-time data collection from PPL and OGDCL gas fields located in Balochistan province of Pakistan.
Phase#2: Study of various possible natural gas to LNG routes.
Phase#3: Selection of two LNG routes based on production significance.
Phase#4: Study and selection of significant process variables.
Phase#5: Real-time plant data simulation in two selected LNG routes.
Phase#6: Comparison of results of two LNG routes.
Phase#7: Optimize for production of LNG.
Phase#8: Data sharing with PPL and OGDCL management.
Phase#9: Research paper writeup and publication.
Phase#10: Final year project writeup and submission.

Benefits of the Project

  1. This project aims at investigationg several possible routes to explore the conversion of process natural gas to liquefied natural gas of indigenous resources of Balochistan.
  2.  The project provides significant evaluation of process variable and provides possible beneficial selection among tested through simulation techniques.
  3. The pre-feasibility analysis of the LNG through HYSYS simulation and prospect to ultilize indigenous resources of natural gas for the production of LNG is the need of present days.

Technical Details of Final Deliverable

  1. Licensed HYSYS v12 software .
  2. Collection of data of process natural gas from various gas fields located in Balochistan province by road trip.

Final Deliverable of the Project

Software System

Core Industry

Petroleum

Other Industries

Energy

Core Technology

Clean Tech

Other Technologies

Others

Sustainable Development Goals

Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
HYSYS software Equipment17000070000
OGTCL plant visit Miscellaneous 150005000
PPL plant visit Miscellaneous 150005000
Total in (Rs) 80000
If you need this project, please contact me on contact@adikhanofficial.com
Design and Fabrication of Energy Harvesting Lat pull-down Machine

To preserve the natural environment and non-reusable natural sources of energy such as fos...

1675638330.png
Adil Khan
10 months ago
Intelligent Sales and Lead Enrichment

INSALE is a web-based application and users can access this application from any browser....

1675638330.png
Adil Khan
10 months ago
PLC based Hybrid Automatic Generation Control

The present world relies on clean and continuous power supply, which means relying on Rene...

1675638330.png
Adil Khan
10 months ago
High-Precision Simulated Image-Guided Cardiac Interventions

This final year project aims to extend the earlier developed FYP entitled, ?Cardiac Cathet...

1675638330.png
Adil Khan
10 months ago
Operating System Lecture 8

defaultuser.png
Faisal Khan
6 years ago