The raising demand of liquefied natural gas (LNG) in many countries showed increasing concern to investigate serveral possible routes of converaion of natural gas to LNG. The conversion of natural gas to LNG through stimulation method has always been considered a vital tool to access necessary plant
Utilization of indigenous Natural gas resources of Balochistan to Liquified petroleum gas using HYSYS simulation.
The raising demand of liquefied natural gas (LNG) in many countries showed increasing concern to investigate serveral possible routes of converaion of natural gas to LNG. The conversion of natural gas to LNG through stimulation method has always been considered a vital tool to access necessary plant design equipment requirments and pre-feasibility analysis. Simulation techniques such as process development in HYSYS v12 software are always helpful to study process parameters and optimize production. In this project, process natural gas data from gas fields located in Balochistan provience will be collected. The gas field selected for this project is PPL and OGDCL located in Dera Bugti region of Balochistan. The data will then be simulated in HYSYS software to access conversion into LNG. Among various LNG routes, two process will be simulated and analyzed. The significant process variable will be tested and analyzed. Optimization of the process variables to maximize production. This study provides first time simulation of real plant data to examine and explore production of LNG. The data will be shared with PPL and OGDCL for further process development and analysis.
This project will be implemented in 10 phases over a time span of 6 months.
Phase#1: Real-time data collection from PPL and OGDCL gas fields located in Balochistan province of Pakistan.
Phase#2: Study of various possible natural gas to LNG routes.
Phase#3: Selection of two LNG routes based on production significance.
Phase#4: Study and selection of significant process variables.
Phase#5: Real-time plant data simulation in two selected LNG routes.
Phase#6: Comparison of results of two LNG routes.
Phase#7: Optimize for production of LNG.
Phase#8: Data sharing with PPL and OGDCL management.
Phase#9: Research paper writeup and publication.
Phase#10: Final year project writeup and submission.
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| HYSYS software | Equipment | 1 | 70000 | 70000 |
| OGTCL plant visit | Miscellaneous | 1 | 5000 | 5000 |
| PPL plant visit | Miscellaneous | 1 | 5000 | 5000 |
| Total in (Rs) | 80000 |
To preserve the natural environment and non-reusable natural sources of energy such as fos...
INSALE is a web-based application and users can access this application from any browser....
The present world relies on clean and continuous power supply, which means relying on Rene...
This final year project aims to extend the earlier developed FYP entitled, ?Cardiac Cathet...