UNDER SURFACE OBJECT DETECTION SMART ROBOT BASED ON GSM COMMUNICATION (UODSRS)

This proposal is about designing & developing a prototype smart robotic system with the objective  to sense the obstacle under the surface of earth. The system will be able to transmit the information on real time bases. Our system will incorporate state of the art technologies based o

2025-06-28 16:36:29 - Adil Khan

Project Title

UNDER SURFACE OBJECT DETECTION SMART ROBOT BASED ON GSM COMMUNICATION (UODSRS)

Project Area of Specialization RoboticsProject Summary

This proposal is about designing & developing a prototype smart robotic system with the objective  to sense the obstacle under the surface of earth. The system will be able to transmit the information on real time bases. Our system will incorporate state of the art technologies based on  artificial intelligence, Internet of things and pervasive computing technologies  to mitigate and automate the mankind physical efforts. In such situations, the environmental actions are partially controllable and observable by the smart robot system. The existing robotic systems do not have the capability to directly control the human actions but surely have the ability to partially observe different scenarios. In the proposed project, we have  targeted a new paradigm that will  incorporate the AI and smart sensing techniques with the sole aim to develop a fully autonomous Smart Robotic System. The autonomous system will be capable to detect obstacles and send SMS alert via GSM module.

Project Objectives Project Implementation Method

The agile process model will be used to develop the project. The overall project strategy would  consist of six phase as mentioned below    .

Phase-1: [Requirement gathering/Communication]

In this phase we will develop  SRS (Software Requirement Specifications) to reflect complete requirement perspective about the projec.

Phase-1I: [Planning]

Predictive methods entirely depend on the requirement analysis and planning done in the beginning of cycle. Any changes to be incorporated go through a strict change control management and prioritization.

Phase-III: [Design]

In this design phase we will choose plan for a solution of the problem which are specified by the document.

Phase-IV: [Implementation]

In this phase the system is actually build. The first step will be the construction, during which the system is build and tested to ensure it will perform as it is supposed to be.

Phase-V: [Testing]

In this phase we will test our coding and install it on hardware, and will again test the final result. 

Phase-VI: [Review]

In this phase the assessment will be done. This phase will accomplished when project is complete.

Benefits of the Project Technical Details of Final Deliverable

The technical and final deliverable of the proposed project will be consist of the following.

Final Deliverable of the Project HW/SW integrated systemType of Industry Others Technologies RoboticsSustainable Development Goals Life on LandRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 39120
Arduino Equipment328008400
DC Moters Equipment4130520
Sensors Equipment510005000
Jumper wires Equipment52001000
Proteus IDE Miscellaneous 130003000
Stationary Miscellaneous 26001200
Thermal Camera Equipment12000020000