Traffic Violation Detection

In a fast-paced environment of today society, safety issues related to driving is considered a second priority in contrast to travelling from one place to another in a shortest possible time. This often led to possible accidents. Hence, Aggressive driving behavior even as a fast lane change

2025-06-28 16:36:26 - Adil Khan

Project Title

Traffic Violation Detection

Project Area of Specialization Artificial IntelligenceProject Summary

In a fast-paced environment of today society, safety issues related to driving is

considered a second priority in contrast to travelling from one place to another in a shortest possible time. This often led to possible accidents. Hence, Aggressive driving behavior even as a fast lane change on big roads, motorways and sudden braking which often leads to accidents are likely to occur. In order to reduce road traffic accidents, one domain which requires to be focused on is driving behavior. Therefore traffic violations to ensure traffic safety & reduce traffic accidents.  

Project Objectives Project Implementation Method

The methodology used in project is Iterative of (SDLC). Because the iterative model is repetition incarnate. Instead of starting with fully known requirements, you implement a set of software requirements, then test, evaluate and pinpoint further requirements. A new version of the software is produced with each phase, or iteration. Rinse and repeat until the complete system is ready.

One advantage over the SDLC methodologies, this model gives you a working version early in the process and makes it less expensive to implement changes.

Tools for Project

Benefits of the Project Technical Details of Final Deliverable

Collection of literature                            Two Weeks

Study of Literature                                   Two Weeks

Analysis of Proposed Scheme             One Month

Preparation of Scheme/Model              One Month

Implementation of Scheme/Model       One Month

Analysis and Simulation                        One Month

Result Formulation                                 Two Weeks

Final Write-up & Thesis Submission   Two Weeks

Final Deliverable of the Project Software SystemType of Industry IT Technologies Artificial Intelligence(AI)Sustainable Development Goals Good Health and Well-Being for PeopleRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 70000
laptop Equipment15000050000
Android phone Equipment12000020000