Three phase fault detection

This project is a best monitoring process of our generation of our electricity. This is very useful for our distribution of electricity  because it is detection of fault. It can be detect two fault line to line and line to ground. So, it need less men power for it operation. It is very protect

2025-06-28 16:36:22 - Adil Khan

Project Title

Three phase fault detection

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

This project is a best monitoring process of our generation of our electricity. This is very useful for our distribution of electricity  because it is detection of fault. It can be detect two fault line to line and line to ground. So, it need less men power for it operation. It is very protect for our people.

Project Objectives

We intend to design a system in which the problem, be it gound to line or line to line can be detected easily and also precisely the control room will be notified of the exact location of the problem.

Project Implementation Method

First of all we use power transformer for step down of input power and then we current transformer and we also use power rectifier for rectify the power for give input supply to our circuit and we also use ardino for control all this prototype. We also use three loads and we use switchs for generating fault and ardino detect it and show on lcd screen what kind of fault it and it  also tell the distance and we can also see on loads which or bulb.

Benefits of the Project

The problem can be fixed timely.The problem can easily be detected.The time required to detect the fault will decrease.

Technical Details of Final Deliverable

This project is a cheap way to monitor our distribution system of our electricity. This need less human attraction and this way human error are not include in this process so, it is protection of  all human and also instruments and with help of this project electricity losses are reduce in pakistan.

Final Deliverable of the Project Hardware SystemCore Industry Energy Other Industries Others Core Technology OthersOther TechnologiesSustainable Development Goals Industry, Innovation and InfrastructureRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 40000
Power transformer,ardino,wires,lcd,three loads, switches and other thi Equipment8500040000