Adil Khan 11 months ago
AdiKhanOfficial #FYP Ideas

Techno Economic analysis of low voltage distribution system due to violation of sanction load

Power utilities in different countries especially in the developing ones are incurring huge losses due malfunctioning of electrical energy. As the population is increasing the electricity demand is also increasing. Domestic load is the major burden in residential area. Consumer uses the electricity

Project Title

Techno Economic analysis of low voltage distribution system due to violation of sanction load

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

Power utilities in different countries especially in the developing ones are incurring huge losses due malfunctioning of electrical energy. As the population is increasing the electricity demand is also increasing. Domestic load is the major burden in residential area. Consumer uses the electricity above the sanction load. Overloading/sanctioned load violation problems occurs in residential area results in loss of electrical energy providing generating sector. Due to overloading, some rural areas are facing problems of load shading. The overloading occurs on transformers and conductors and it may reduce their life span. Electrical utilities faces large economic losses every year. In this paper major focus is on residential sector.

The main objective of this project is to calculate the power losses, economical losses and the effect of overloading at conductor’s and transformer’s life in distribution system.

Project Objectives

  • To idendtify the sanctioned load violation
  • To calculate power loss
  • To calculate the effect on transformer 's life
  • To calculate the effect on conductor's life 
  • To calculate economical loss
  • How to overcome sanctioned load violation

Project Implementation Method

Hardware:

             Energy data logger

Software:

            Matlab

  • Slecting the one Transformer of specific area
  •  Collecting the rated data from wapda of that specific area 
  • Measuringthe actual data of specific area from energy data logger
  • Comparing the rated and measured data 
  • Calculating the power loss from comparison 
  • See the effect on transformer's and conducter's life
  • Also simulating the results on MATLAB

Benefits of the Project

  • To overcome the sanctioned load violation 
  • To overcome the power loss
  • To overcome the load shedding
  • To overcome the economical losses 

Technical Details of Final Deliverable

In this project both technically and economically losses are calculated of low voltage distribution system in power field.

Also in this project there are solutions to overcome the technically and economically losses.

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Energy

Other Industries

Core Technology

Clean Tech

Other Technologies

Sustainable Development Goals

Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Energy Data logger Equipment41500060000
Travelling cost Miscellaneous 130003000
Total in (Rs) 63000
If you need this project, please contact me on contact@adikhanofficial.com
0
103
GPS BASED AUTONOMOUS ROVER

Autonomous navigation systems are currently receiving major interest in the field of robot...

1675638330.png
Adil Khan
11 months ago
Smart door lock security system

Our project is Door Lock Security System. It is placed on university main gate and we assi...

1675638330.png
Adil Khan
11 months ago
Rules Of Inference

defaultuser.png
Rehan Khan
7 years ago
Jmate

This app is to manage trips we can say it is a trip/journey management system. This applic...

1675638330.png
Adil Khan
11 months ago
Agri Pro Integrated Underground Crops Harvester

The project provides an agricultural solution for harvesting four major crops includng Pot...

1675638330.png
Adil Khan
11 months ago