Software development for HVAC load calculation
HVAC load calculations is very rigorous, time consuming and also there might be chance of human error in manual calculations. But with the help of computer software the process of load calculation would be easy in minimal time and with accuracy. So a computer software based on CLTD method is develop
2025-06-28 16:36:00 - Adil Khan
Software development for HVAC load calculation
Project Area of Specialization Mechanical EngineeringProject SummaryHVAC load calculations is very rigorous, time consuming and also there might be chance of human error in manual calculations. But with the help of computer software the process of load calculation would be easy in minimal time and with accuracy. So a computer software based on CLTD method is developed to achieve the foresaid objectives.
Project Objectives- To develop software for load calculation named WEC-CLTD
- To design the HVAC system of POFIT-Auditorium
- Load calculation of POFIT-Auditorium manually and by WEC-CLTD
- To determine the temperature and velocity distribution with and without HVAC system by using CFD techniques
Methodology key steps
- Data collection
- Software Development
- Site Selection
- Load Calculations
- Manual Load Calculations
- Calculation Comparision (for software testing)
- CFD Analysis
- Manual calculation is a time consuming process and have a lot of error chances while by using the software we save the time and minimum error chances.
- WEC-CLTD has the built in data for different cities of Pakistan so the data collection for the calculation would not be required.
- Cooling load calculations are not easy so by replacing it with software it would be user friendly.
- By Having a cooling and heating load calculation software for Pakistan it would be easy for every layman to calculate the tonnage according to requirement.
Windows based software with Microsoft Visual Studio 2019 compiler and SQL data server using C#.net framework and "Xml" for graphic interface. By this software the process of load calculation would be easy in minimal time and with accuracy based on CLTD method to achieve the foresaid objectives.
Final Deliverable of the Project Software SystemCore Industry OthersOther Industries Others Core Technology OthersOther Technologies OthersSustainable Development Goals Industry, Innovation and InfrastructureRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 20000 | |||
| Tablet | Equipment | 1 | 20000 | 20000 |