Robotic Arm

Our project mainly deals around the shearing operation, were the sheet is picked manually and placed on the belt for shearing which involves risk factor. Our challenge is designing of pick and place operator to carry the sheet from the stack and place it in the shearing machine for the feeding

2025-06-28 16:28:59 - Adil Khan

Project Title

Robotic Arm

Project Area of Specialization Artificial IntelligenceProject Summary

Our project mainly deals around the shearing operation, were the sheet is picked manually and placed on the belt for shearing which involves risk factor. Our challenge is designing of pick and place operator to carry the sheet from the stack and place it in the shearing machine for the feeding

Project Objectives

Designing, Modelling, and Simulation of the pick and place mechanism. We need to have a time study between currently undergoing a manual operation and a newly designed automated operation.

 The frequency of this operator, its repeatability, lifetime, etc. is to be found out.

 The choice of the end effector, its design, and analysis should be carried out and documented.

Project Implementation Method

The basic idea of this project is the implementation of the robotic arm. Though it can be implemented in various methods, when different parameters are taken into consideration this model is the most feasible way of implementation. Another way of enactment the model is by enabling them to adapt to their surroundings.

Benefits of the Project Technical Details of Final Deliverable

The main reason to make the choice of designing a robotic arm firstly is the transport of the sheet from the stack to the shearing machine. Second, there is a space constraint we have in the industry. The stack of the sheets and the shearing machine are close to each other. They are so close that any other kind of transport such as a linear robot (conveyor) cannot be used. That leaves us with the only choice to build a robotic arm that can work in small and congested environments.

Final Deliverable of the Project HW/SW integrated systemCore Industry ITOther Industries Others Core Technology Artificial Intelligence(AI)Other Technologies RoboticsSustainable Development Goals Decent Work and Economic Growth, Industry, Innovation and InfrastructureRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 80000
PIC16F877A 8-bit Microcontroller Equipment21000020000
3D printed parts Equipment14300043000
16x2 LCD display Equipment410004000
servo motors Equipment310003000
Hardware and Structure Miscellaneous 11000010000