The main idea of our project is to create a smaller, energy efficient vehicle for personal transportation with maximum performance and higher stability. So, we are working on a project which uses bike engine we are shaping it according to aerodynamics .So basically, we a making a vehicle
Reverse Trike Formula Car
The main idea of our project is to create a smaller, energy efficient vehicle for personal transportation with maximum performance and higher stability. So, we are working on a project which uses bike engine we are shaping it according to aerodynamics .So basically, we a making a vehicle which is not a bike nor a car specifically and we named it Reverse Trike Formula Car.
A Reverse Trike can be identified as having a single rear wheel driving the motorcycle with two wheels steering the front.
We basically work on reverse Trike setup because of the simplicity in design, high performance, easy
maintenance, and safety at very reasonable prices. Our propose project covers these key areas:
Part Selection | Chassis Design | Suspension System | Procurement | Reverse Trike Assembly | Suspension System Assembly | Final Assembly | Testing | |
| Power Train Component | force evaluation | load analysis | procurement process | pipe work | Organize Parts | Steering system assembly | Manual inspection of welding and assembly | |
| Electrical Component | Ergnomics | Dynamic simulation | deliver parts to assembly line | joint work | Assemble front Suspension | power train assembly | Acceleration test | |
| Tires | Material Analysis | Material analysis | Painting | Assemble rear suspension | Breaking system assembly | Breaking Test | ||
| driver gear | weight analysis | Final drawings | Construction | Deliver to final assembly | Detail and customization | Endurance Test | ||
| breaking system | final drawings | Levelling/Adjustment | Painting | |||||
| steering system components | Deliver to final assembly | |||||||
| miscellaneous components |
| Elapsed time in (days or weeks or month or quarter) since start of the project | Milestone | Deliverable |
|---|---|---|
| Month 1 | Chassis Design & Modelling in solid works | Achieved |
| Month 2 | Chassis Simulation and Aerodynamic Calculations | Achieved |
| Month 3 | Market survey | Achieved |
| Month 4 | Part selection (engine, chassis material, miscellaneous component) Chassis pipe purchasing | Achieved |
| Month 5 | Chassis Welding (Arc Welding) | Achieved |
| Month 6 | Installation of Wishbone, Upright, Steering system, Braking system and other components | Achieved |
| Month 7 | Engine installation, power train | Achieved |
| Month 8 | Final Testing | Achieved |
Fire Fighting is a challenging platform especially when fire is spread out away from cente...
This Project is an Enterprise IT Network Infrastructure for Local Area Network that based...
ARTIFICAL INTELLIGENCE ASSISTED FOOT SCAN SYSTEM FOR DIABETIC PATEINTS: (OPTICAL PEDOGRAPH...
Nothing compares to the feeling of dread when you get out of a cab or train and realize yo...