Refrigerator Evaporator System (Multi-Phase Flow)

In any refrigeration system evaporators play a key role in the whole cycle. The purpose of the evaporator is to extract heat from the refrigerator cabin. At the inlet of the evaporator, cold refrigerant in liquid form enters. While passing through tubes it absorbs heat from surrounding and changes i

2025-06-28 16:34:46 - Adil Khan

Project Title

Refrigerator Evaporator System (Multi-Phase Flow)

Project Area of Specialization Mechanical EngineeringProject Summary

In any refrigeration system evaporators play a key role in the whole cycle. The purpose of the evaporator is to extract heat from the refrigerator cabin. At the inlet of the evaporator, cold refrigerant in liquid form enters. While passing through tubes it absorbs heat from surrounding and changes its phase to vapor thus creating a cooling effect. The design of the cooling fins in the evaporator plays a key role in cooling. The purpose of this project is to analyze the different configurations of evaporator design for an existing refrigerator and by the means of simulation and analyses optimize it further.

Project Objectives

Understanding the concepts, working and function of refrigeration process in detail. 

To have a handful experience on a suitable software for analyzation and simulation of different evaporator configurations.

To design an optimized system of evaporator design to get better and enhanced results after implementing the refrigeration concepts.

Project Implementation Method

Applying Techniques of the Heat Transfer method.

Performing Analytical calculation of the designed system.

Ansys model design and development.

CFD analysis of the optimized model with a detailed study of Phase Change Materials working phenomena.

Benefits of the Project

Applying Techniques of Heat Transfer method.

Performing Analytical calculation of the designed system.

Ansys model design and development.

CFD analysis of optimized model with detail study of Phase Change Materials working phenomena.

Technical Details of Final Deliverable

Optimized design of a refrigeration system.

Comparison of our model with different configuration working models.

Efficiency, Power, and calculation of other necessary parameters involved in the designed system.

Final Deliverable of the Project Hardware SystemCore Industry ManufacturingOther IndustriesCore Technology OthersOther TechnologiesSustainable Development Goals Partnerships to achieve the GoalRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 33000
Aluminum Pipes and Sheets Equipment710007000
Copper pipes and Sheets Equipment710007000
DC power supply Equipment140004000
UNO with wires Equipment110001000
Thermocouple Equipment510005000
Sensors Equipment410004000
Special Proxies Equipment510005000

More Posts