Protection of micro grid using signal processing technique
In the project at first phase IEEE_13 node test system is designed and proposed protection scheme Hilbert transform based on signal processing technique is applied to the test module software based. In the second phase the project is designed in physical form and tested for the same protection schem
2025-06-28 16:28:52 - Adil Khan
Protection of micro grid using signal processing technique
Project Area of Specialization Electrical/Electronic EngineeringProject SummaryIn the project at first phase IEEE_13 node test system is designed and proposed protection scheme Hilbert transform based on signal processing technique is applied to the test module software based. In the second phase the project is designed in physical form and tested for the same protection scheme for different fault occurring in the system.
Project ObjectivesThere are three main objectives of this project which are as follows's
1)Design a test network
2)Fault analysis
3)Implementation of proposed scheme
Project Implementation MethodThe project is divided into two phase. In the first phase IEEE_13 node system is designed and tested for the proposed Hilbert transform based signal processing technique protection scheme. In the second phase the module is designed in physical form and at last thesis writing is done.
Benefits of the ProjectThere are many benefits of an active distribution network in today’s world. The reason is that now day’s there is crisis of electricity. There is to much load shedding due to less supply. So our project as a great impact on the socio-economic features.
Technical Details of Final DeliverableAt the end the prototype of an active distribution system containing a PV array , DC/AC converter ,transformer, Generator (Grid station) and the applied load.
Final Deliverable of the Project HW/SW integrated systemCore Industry Energy Other IndustriesCore Technology Clean TechOther TechnologiesSustainable Development Goals Affordable and Clean Energy, Industry, Innovation and InfrastructureRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 80000 | |||
| Solar pv array | Equipment | 10 | 2500 | 25000 |
| DC/AC converter | Equipment | 1 | 20000 | 20000 |
| Generator | Equipment | 1 | 10000 | 10000 |
| Transformer | Equipment | 1 | 10000 | 10000 |
| Resistor,Inductor , capacitors and wiring | Equipment | 1 | 5000 | 5000 |
| Thesis printing | Miscellaneous | 1 | 3000 | 3000 |
| Repair and maintances | Miscellaneous | 1 | 6000 | 6000 |
| Human resources | Miscellaneous | 1 | 1000 | 1000 |