Priority Based Load Monitoring Energy Device

This project strives to launch a framework for energy device to avoid the complete blackout. The results show that energy device is a viable option.  The complete shutdown could be avoided and continuous supply of electricity will be ensured to high priority circuit board by selective load shed

Project Title

Priority Based Load Monitoring Energy Device

Project Area of Specialization

Internet of Things

Project Summary

This project strives to launch a framework for energy device to avoid the complete blackout. The results show that energy device is a viable option.  The complete shutdown could be avoided and continuous supply of electricity will be ensured to high priority circuit board by selective load shedding. Graphical user interface provide new techniques to priorities the load according to the demand.

Project Objectives

This project is designed for the purpose of load monitoring for load management to avoid complete blackout, as well as communicate with energy device to assure the supervision of the company. The model will be tested for varying amounts of power thefts through earthing and also for different types of circuit approximations. To ensure no power blackout, only priority based load shedding. Monitoring and supervision will be based on Internet of Thinks (IoT) that will give the supplier the ability to correct the power factor by controlling the consumer’s load consumption.

Project Implementation Method

by hardware and software

Benefits of the Project

There will be no power blackout, only priority based load shedding will be carried out. The consumers will understand their load patterns. A stable system for basic needs of electrical energy consumers in Pakistan. An application web server based monitoring system to monitor the power as well as control the consumer’s energy device. It has an IoT based monitoring system in which the data of consumed power, voltage, current and power factor will transmitted wirelessly to access the control of device and user consumption record can be made by electric supplier company.

Technical Details of Final Deliverable

Priority  Based Load Monitoring Energy Device hepl in distribute in the  Electricity and also we can the energy power and also improve the power factor

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Others

Other Industries

Others

Core Technology

Internet of Things (IoT)

Other Technologies

Internet of Things (IoT)

Sustainable Development Goals

Affordable and Clean Energy

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
DC Power Supply Equipment130003000
Arduino Mega Equipment112501250
WI-FI Module Equipment125002500
20x4 LCD Equipment1800800
Current Transformer Equipment1900900
Potential Transformer Equipment1900900
Dual Relay Module Equipment27501500
casing of device Equipment140004000
Capacitor Bank Equipment155005500
IOT Equipment220004000
Visiting the Market Miscellaneous 420008000
Total in (Rs) 32350
If you need this project, please contact me on contact@adikhanofficial.com
0
123
Mobi Gate Android App Based Gate Controller

The Mobi gate android application will help to increase the efficiency and optimizati...

1675638330.png
Adil Khan
1 year ago
Skin Disease Detection using Artificial Intelligence Algorithms

Skin disorders are more widespread than other diseases and have a significant influence on...

1675638330.png
Adil Khan
1 year ago
Voice Mail for Visually Impaired Persons

First, the Guardian will register the blind user. Then the user will login through Biometr...

1675638330.png
Adil Khan
1 year ago
Face Mask Detection And Alert System

The present scenario of COVID-19 demands an efficient face mask detection application. The...

1675638330.png
Adil Khan
1 year ago
Back in Control

Stroke has been regarded as the most common cause of disability and a leading cause of mor...

1675638330.png
Adil Khan
1 year ago