Adil Khan 10 months ago
AdiKhanOfficial #FYP Ideas

POWER SYSTEM SURVEILLANCE USING QUAD-COPTER IN REAL TIME

Proper distribution of electricity is problem, facing by the eservice provider. They face many issues during this one of the major issue or this is the faults occurs in insulators. To avoid this issue they use their employees for surveillance of this which is harmful for them and more time and resou

Project Title

POWER SYSTEM SURVEILLANCE USING QUAD-COPTER IN REAL TIME

Project Area of Specialization

Robotics

Project Summary

Proper distribution of electricity is problem, facing by the eservice provider. They face many issues during this one of the major issue or this is the faults occurs in insulators. To avoid this issue they use their employees for surveillance of this which is harmful for them and more time and resources consuming. We introduce the prototype which can monitor insulators and their health to without harming human life and using less time and resources. By using the quad-copter and sensors we are performing this task. Temperature and humidity sensors are used to monitor the health of the system and its environment. Quad copter is used for capturing images of the system and insulator. We are performing image processing on the images of insulators to detect the faults in insulators which we captured via drone.

Project Objectives

Surveillance of power system in real time using quad copter and environment condition around the system in real time.

Project Implementation Method

We use quad copter as a tool to capture images of the power system specially. Small sensor box is install in quad copter for the humidity around the system and temperature of the system. Matlab is used for images processing on the images we get from drone. By analyzing the different results we design a chart for comparison among the faulty and good one insulators. Humidity and temperature reading is used to analyses the further characteristics of the system.

Benefits of the Project

  • Reduce human effort.
  • Time saving.
  • Maximize monitoring efficiency.
  • Environmental analysis around power system.
  • Reduce human resources.

Technical Details of Final Deliverable

By using this prototype we can monitor the Power system and avoid future disturbance in power distribution. This prototype is just an idea to provide better way for the surveillance of distribution system. This prototype can be enhance in future by using many different ways.

Final Deliverable of the Project

HW/SW integrated system

Type of Industry

Energy , Telecommunication

Technologies

Internet of Things (IoT), Robotics, Others

Sustainable Development Goals

Good Health and Well-Being for People, Decent Work and Economic Growth, Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
drone Equipment17000070000
sensor Miscellaneous 310003000
Total in (Rs) 73000
If you need this project, please contact me on contact@adikhanofficial.com
What is Form Validation

1675638330.png
Adil Khan
6 years ago
IOT BASED SMART RENEWABLE WHEAT THRESHING MACHINE

In the 21st Century where world is going towards the green energy, smart devices, integrat...

1675638330.png
Adil Khan
10 months ago
Non Intrusive Load Management System

Our project brings the implementation and application of Non-Intrusive Load Monitoring (NI...

1675638330.png
Adil Khan
10 months ago
The design of vehicle classification system on low cost embedded board

Detection and classification of moving vehicle in a real time is relatively a challenging...

1675638330.png
Adil Khan
10 months ago
Home Area Networking

we aim to develop a home area network which will consist of home automation and smart mete...

1675638330.png
Adil Khan
10 months ago