Adil Khan 1 year ago
AdiKhanOfficial #FYP Ideas

Power Factor Improvement using Thyristor Switch Reactance

Our project is based on Power Electronics. In this project we are improving the power factor through Thyristor Switch Reactance (TSR). TSR belongs to Flexible AC Transmission System. We are desining this project for industries. Our project improves the power factor from 0.5 to 0.80.

Project Title

Power Factor Improvement using Thyristor Switch Reactance

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

Our project is based on Power Electronics. In this project we are improving the power factor through Thyristor Switch Reactance (TSR). TSR belongs to Flexible AC Transmission System. We are desining this project for industries. Our project improves the power factor from 0.5 to 0.80.

Project Objectives

1. Improvement of Power Factor

2. Enhance Relaibility in present power system 

3. Reduces the power losses
 

Project Implementation Method

We are making a prototype project. We are implementing it on PCB with proper designing and shows the results through LCD.

Benefits of the Project

1. To relaiable the power system. 

2. Reduce the losses which have great effects on cost of electricity used by industries. 

3. It is uninterrupted system due to which industries work will not disturbed.
 

Technical Details of Final Deliverable

At the end of this project we will achieve improved power factor  which have positive effect on industrial electric bills. 

Final Deliverable of the Project

Hardware System

Core Industry

Others

Other Industries

Energy

Core Technology

Others

Other Technologies

Shared Economy

Sustainable Development Goals

Industry, Innovation and Infrastructure

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Arduino Equipment1700700
LCD Equipment1400400
Opto-traic Equipment15050
SCR Equipment2100200
Inductor Equipment15050
Capacitor Equipment31030
Incandescent Bulb Equipment15050
LED Equipment11010
Potential transformer Equipment1200200
Current transformer Equipment1230230
Bridge Rectfier Equipment280160
Opamp Equipment15050
OR gate Equipment14040
Resistors Equipment21020
Total in (Rs) 2190
If you need this project, please contact me on contact@adikhanofficial.com
0
136
Real Time Traffic Management System

Real-Time Traffic Management System (RTMS) is the real-time monitoring of the traffic dens...

1675638330.png
Adil Khan
1 year ago
Farm Data Sampling and Analytics System

This project is a coordinated effort plan at MNS-University of Agriculture, Multan for the...

1675638330.png
Adil Khan
1 year ago
Scrapping Tool

The Summary of This Project is in which extract the Data From Website like Amazon, Alibaba...

1675638330.png
Adil Khan
1 year ago
Alcohol Detecting and Notification System for Controlling Drunk Drivin...

?The use of drinking excessive alcohol while driving, is one of the main causes of acciden...

1675638330.png
Adil Khan
1 year ago
Alif Laam Meem

Muslims unanimously agree that the Quranic studies were at their pinnacle during the time...

1675638330.png
Adil Khan
1 year ago