Online Electric Metering system
IN THIS PROJECT, WE ARE GOING TO FETCH THE DATA FROM THE ELECTRIC METER BY USING NODEMCU AND WILL DISPLAY THE INFORMATION ON LCD AND A WEBPAGE. THE RESULT WILL HOLD THE FOLLOWING INFORMATION: 1) VOLTAGE 2) CURRENT 3) POWER FACTOR 4) UNITS IN THE END, TH
2025-06-28 16:34:20 - Adil Khan
Online Electric Metering system
Project Area of Specialization Internet of ThingsProject SummaryIN THIS PROJECT, WE ARE GOING TO FETCH THE DATA FROM THE ELECTRIC METER BY USING NODEMCU AND WILL DISPLAY THE INFORMATION ON LCD AND A WEBPAGE.
THE RESULT WILL HOLD THE FOLLOWING INFORMATION:
1) VOLTAGE
2) CURRENT
3) POWER FACTOR
4) UNITS
IN THE END, THE BILL WILL BE GENERATED AUTOMATICALLY ON WEBPAGE AND ON LCD ALSO..
Project ObjectivesFOLLOWING ARE THE OBJECTIVES OF OUR PROJECT:
1) REAL-TIME MONITORING OF POWER USAGE.
2) REMOTELY CONTROLLING OF OUR DEVICE.
3) TO PREVENT THE SHORT CIRCUIT.
Project Implementation MethodIN THIS PROJECT, WE WILL COLLECT THE DATA OF OUR ENERGY CONSUMPTION BY THE DELAY OF 1 SECOND. AFTER THAT, THE DATA WILL BE SENSE BY PEZEM MODULE, WHICH IS WORKING AS A SENSOR.AFTER THIS, THE DATA WILL STORE IN MICROCONTROLLER (NODEMCU) MEMORY. AFTER THIS PROCESS, ALL THE CALCULATED DATA WILL BE TRANSFERRED THROUGH BUILTIN WILAN CHIP IN NODEMCU TO THE WEBSITE.
OTHER THAN THIS, PROTECTION SYSTEM WILL ALSO BE INSTALLED IN THIS PROJECT, WHICH MAIN AIM IS TO DETECT OVERCURRENT FAULT IN ORDER TO PREVENT SHORT CIRCUIT.
Benefits of the ProjectFOLLOWING ARE THE BENEFITS OF OUR PROJECT:
1) REAL-TIME MONITORING OF POWER USAGE.
2) REMOTELY CONTROLLING OF OUR DEVICE.
3) TO PREVENT THE SHORT CIRCUIT.
4) LESS TIME CONSUMING.
5) REDUCE THE CHANCES OF INACCURACY.
6) HIGHLY EFFICIENT.
7) REDUCE MAN POWER.
8) LOW COST PRODUCT.
9) OVERCOMES THE MANUAL METHOD OF TAKING READINGS FROM METER
Technical Details of Final Deliverable1) The aim of this has been to integrate modern technologies with a view to enhancing the current power solutions available, with a view to betterment of mankind.
2) An Online Electric Metering System has to be Cost-effective i.e. costs of implementation, maintenance should be reduced while providing robust and reliable performance.
3) And one very important thing is the relationship between the customer and the supplier must be considered. And easily Monitoring electric meter reading through Website.
Final Deliverable of the Project HW/SW integrated systemCore Industry Energy Other IndustriesCore Technology Internet of Things (IoT)Other TechnologiesSustainable Development Goals Affordable and Clean EnergyRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 30000 | |||
| SINGLE PHASE ENERGY METER | Equipment | 1 | 3500 | 3500 |
| NODEMCU | Equipment | 4 | 1200 | 4800 |
| PEZEM-004T | Equipment | 4 | 2500 | 10000 |
| RELAY MODULE | Equipment | 2 | 500 | 1000 |
| POWER SUPPLY | Equipment | 2 | 1000 | 2000 |
| PCB | Equipment | 4 | 300 | 1200 |
| LCD | Equipment | 2 | 250 | 500 |
| MODELLING BOARD | Equipment | 1 | 500 | 500 |
| MOTOR (300 W) | Equipment | 1 | 1500 | 1500 |
| FUEL AND PROTOTYPE | Miscellaneous | 1 | 5000 | 5000 |