This project actually detect different sources like main electricity and other alternative sources like generator and ups and based upon the conditional priority the sources will deliver the load for that we have designed a ATS (automatic transfer switch). Secondly we have made the wirel
IOT based smart power source detection and conditional wireless load managment
This project actually detect different sources like main electricity and other alternative sources like generator and ups and based upon the conditional priority the sources will deliver the load for that we have designed a ATS (automatic transfer switch).
Secondly we have made the wireless system which will manage (Switch off ) the load on alternative sources wirelessly based upon requirement.
Thirdly we have incorporated our project with iot features by which we can monitor different parameters like voltage power etc remotely.
Project objective is to solve the real time problems of indutrialists and common residents facing problems with their power delivery and make their system efficient enough under abnormal conditions .
we also automated the generator like automatic on/off and its chowk control through servo.(only applicable to generators having preinstalled sulf system ).
Project was implemented in two Phases.
1.Generator automation & ATS design.
2.Wireless system for wireless load management.
3. Iot based web page for the data monitoring.
1.Uninterruptable power supply for the houses and industries.
2.Automated and intelligent system(Load management).
3.Remotely monitorable.
For the customer who want to install this system is being provided with two devices.
One is the SOURCES side which will automate the generator + detect the sources available based upon which it will decide weather to switch on/off the load.
Second is the Load side device which is connected with the load we want to switch on/off . this one is remote device so we also make battery backup which is rechargeble and nearly uninterruptable .
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| ATS Kit | Equipment | 1 | 1800 | 1800 |
| Finder Relay | Equipment | 2 | 480 | 960 |
| contactors(GMC22) | Equipment | 2 | 1200 | 2400 |
| Servo | Equipment | 1 | 700 | 700 |
| Arduino Nano | Equipment | 2 | 1300 | 2600 |
| fuses | Equipment | 2 | 60 | 120 |
| LM7805 | Equipment | 3 | 30 | 90 |
| Generator | Equipment | 1 | 42000 | 42000 |
| Esp32 | Equipment | 1 | 800 | 800 |
| Relay modules. | Equipment | 2 | 100 | 200 |
| li-ion batteries | Equipment | 2 | 500 | 1000 |
| li-ion charger protection | Equipment | 1 | 800 | 800 |
| power Supply | Equipment | 1 | 150 | 150 |
| project boxes & wires&veroboards ets | Miscellaneous | 8 | 1000 | 8000 |
| Total in (Rs) | 61620 |
Gantry crane is widely used to transfer the heavy load from one place to another, in movin...
This project converts the mechanical power to electrical power through the rotation o...
We are going to make a product that would facilitate the workers that frequently sit or st...
The flow power networks will encounter a significant change in the coming years. The new a...
The electricty is now one of the most important part of the world. The transmission lines...