The aim of this project is to design a system that is cost effective and synchronize photovoltaic power and grid or and use them simultaneously. We will design an inverter that will convert the PV power to three phase supply. The device will monitor the parameters of both grid and the three pha

2025-06-28 16:32:47 - Adil Khan

Project Title

grid synchronized photovoltaic system

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

The aim of this project is to design a system that is cost effective and synchronize photovoltaic power and grid or and use them simultaneously. We will design an inverter that will convert the PV power to three phase supply. The device will monitor the parameters of both grid and the three phase PV power. After monitoring the parameters of supplies, the device will synchronize. On the other hand, if there is no sunlight i.e. at night or during cloudy weather, then the system will switch on complete power from utility grid.

Project Objectives

  To design a PV system

  To design a cost effective three phase inverter

  To design a system for synchronization of PV power with other     AC power supplies.

  To design a monitoring system for parameters of power from      different supply sources

Project Implementation Method

The maximum power from the photovoltaic cell will be achieved by the method of Maximum Power Point Tracking (MPPT) because each PV system has a point at which current and voltage output from the PV result in the maximum power output.

The input power from the grid is three phase for commercial use. The device will track the parameters of the incoming signal from the grid and the modulated signal of MPPT will be synchronized with it. Now the synchronized signal can be used along with grid power.

The maximum power will be utilized to run the load from photovoltaic system. There are fluctuations in power demand due to varying load industry. To deal with these load fluctuations load, the propose system will draw power from the grid.  

Benefits of the Project

Renewable energy source

Handle the maximum load on PV system in daytime

Low maintenance cost

System is recyclable and transferable.

Technical Details of Final Deliverable

Desired capacity of pv system

Three phase sine wave invertor.

Maximum power point tracking system

Synchronizer of PV system with the grid

Final Deliverable of the Project Hardware SystemCore Industry Energy Other IndustriesCore Technology Clean TechOther TechnologiesSustainable Development GoalsRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 51000
ir2110 Equipment52001000
transistors Equipment890720
acs172 Equipment4120480
capacitor Equipment2015300
inductor Equipment52001000
resistor Equipment305150
solar panels Equipment5947047350