Genetic Algorithm Based Optimized Scheduling System For Aircraft Maintenance
The Optimized Scheduling System for Aircrafts Maintenance is a platform to generate an optimized schedule on runtime. Our scheduler will be based upon Genetic algorithms. It is an industry-based project with the affiliation of CARE. This Software will be efficient in rescheduling and monitoring
2025-06-28 16:27:28 - Adil Khan
Genetic Algorithm Based Optimized Scheduling System For Aircraft Maintenance
Project Area of Specialization Artificial IntelligenceProject SummaryThe Optimized Scheduling System for Aircrafts Maintenance is a platform to generate an optimized schedule on runtime. Our scheduler will be based upon Genetic algorithms. It is an industry-based project with the affiliation of CARE. This Software will be efficient in rescheduling and monitoring the overall plan according to the requirements.
Project ObjectivesCompletion of requirements for this project through meetings with clients
Analyzation and research of gathered requirements.
Planning of the project.
Implementation of Flow charts.
Designing of the project modules on the basis of requirements gathered.
Implementation of the modules.
Integration of all modules.
Testing of the entire project for the verification of any type of malfunctions and bugs.
Deployment of the project.
Project Implementation MethodAlgorithm:
Optimization
APIs
Genetic Algorithm
Backend:
Database (MS SQL/Oracle)
C++
Frontend:
React or Node JS
AOs
User Interface
MRO Deployment (Team Selection)
MRO Operations (Repair of Aircraft)
MRO Scheduling (Repair Schedule)
Visualization
Gantt Charts
Production Schedules
Benefits of the ProjectThe project will provide a fully computerized optimization of time schedule for the maintenance of aircraft. It will also help to increase productivity from 10 to 15 percent. Our software will predict the time/duration of tasks Which will help in saving time.
Technical Details of Final DeliverableAlgorithm:
Optimization
APIs
Genetic Algorithm
Backend:
Database (MS SQL/Oracle)
C++
Frontend:
React or Node JS
AOs
User Interface
MRO Deployment (Team Selection)
MRO Operations (Repair of Aircraft)
MRO Scheduling (Repair Schedule)
Visualization
Gantt Charts
Production Schedules
Final Deliverable of the Project Software SystemCore Industry ITOther Industries Others Core Technology Artificial Intelligence(AI)Other Technologies OthersSustainable Development Goals Industry, Innovation and InfrastructureRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 62500 | |||
| laptop | Equipment | 4 | 15000 | 60000 |
| zong internet | Equipment | 1 | 2500 | 2500 |