In this project, we are analyzing Pakistan's renewable energy policy with respect of renewable energy policies and progress (specifically of solar water geysers) of globe. Based on progress analysis and Pakistan's outlook and potential for solar water gerysers, we'll recommend a polic

2025-06-28 16:27:13 - Adil Khan

Project Title

Feasibility Design and Scope of Solar Geysers in Pakistan

Project Area of Specialization Mechanical EngineeringProject Summary

In this project, we are analyzing Pakistan's renewable energy policy with respect of renewable energy policies and progress (specifically of solar water geysers) of globe. Based on progress analysis and Pakistan's outlook and potential for solar water gerysers, we'll recommend a policy and differnce it would have.

Project Objectives
  1. Global outlook for renewable energy (specifically Solar Water Geysers) with repsect to thier policies
  2. Pakistan's outlook and potential of Solar Water Geysers
  3. Comparison of Gas Geysers vs Solar Water Geyser to convince masses
Project Implementation Method
  1. Global Policies (different countries) on mandatory use of solar water heater
  2. Pakistan’s Solar Water Heating
    • Capacity/Potential
    • Agencies/Department (AEDP, PCRET)
    • Paper and their finding
    • Manufacturer of Solar Water Geyser
  3. Recommend Policy
  4. How to convince people/masses for Solar Water Geyser
    • Compare Energy Saving (national an industrial level) for solar vs traditional gas geyser
    • Break Even Analysis
    • Comparison (Modelling)
      1. Solar vs Gas
      2. Difference types of solar geyser (which is more efficient)
  5. Major reason of solar water geyser failure and remedies
Benefits of the Project

If the project achieved it's goal that's to shift the domestic heating load to solar energy, then following benfits could be achieved,

Technical Details of Final Deliverable

Our Final Deliverable will be

  1. Global outlook for Solar Water Geysers with repsect to thier policies, along with identification of best practicies and drawbacks
  2. Pakistan's outlook with prespect of Pakistan's policy - potential and effects (pros and cons) of Solar Water Geysers
  3. Recommended Policy for Solar Water Geyser
  4. Comparison flyer/booklet of gas geyser and solar water geyser for generl public
Final Deliverable of the Project Hardware SystemCore Industry Energy Other IndustriesCore Technology OthersOther TechnologiesSustainable Development Goals Affordable and Clean Energy, Industry, Innovation and InfrastructureRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 15535
Misc (logistic, communication, travel and time-vale of officials) Miscellaneous 127809360
Design and Printing Equipment95656175