The system would be highly efficient; it will be much faster than traditional direct-clash-checking systems in terms of solution searching and constraint validation. The system is expected to particularly perform well in scheduling a large number of exam activities with the large number of candidate
Exam Scheduling System
The system would be highly efficient; it will be much faster than traditional direct-clash-checking systems in terms of solution searching and constraint validation. The system is expected to particularly perform well in scheduling a large number of exam activities with the large number of candidates who registered with multiple papers of different departments. The runtime of the proposed exam scheduling system will be fast and hence an efficient system is expected.
Development of the exams scheduling system through implement at examination department of the HITEC University to deploy the procedure and the practicing being follow the University for scheduling of the exams.
Our system will be able to handle many services to take care of all student’s records in a quick manner. This system will save time, paperwork, human efforts and make the examination more systematic and disciplined.
Deliverables which contain the system developed in ASP.NET to apply on the university working system. Also, it would include the manual for guidance and working tell the user how to operate the system efficient.
| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| bought laptops , | Equipment | 2 | 32000 | 64000 |
| Total in (Rs) | 64000 |
A tube furnace is an electric heating device used to conduct syntheses and purifications o...
The purpose of this project is to save the precious lives which are affected due to road a...
This proposed system is basically indoor video-based surveillance and locating system whic...
University students face problems in looking for societies to join wondering if they would...