Design and Development of Power Generation System using Pelton Wheel Concepts for Rural Area having Natural Waterfalls and Streams

Water is the renewable source of energy and approximately 15% of world energy drives by Hydro power plant. In Pakistan, there are various natural resources such as water, air, wind and solar. Among of them, water resource is the most abundant as there are many rivers and streams with rich electrical

Project Title

Design and Development of Power Generation System using Pelton Wheel Concepts for Rural Area having Natural Waterfalls and Streams

Project Area of Specialization

Mechanical Engineering

Project Summary

Water is the renewable source of energy and approximately 15% of world energy drives by Hydro power plant. In Pakistan, there are various natural resources such as water, air, wind and solar. Among of them, water resource is the most abundant as there are many rivers and streams with rich electrical energy. Moreover, the cost of hydro-electric power is relatively cheaper compared with other resources. This paper intends to design the runner and nozzle with needle for Pelton turbine that will generate 5 kW output power from a water head of 15 m and volumetric flow rate of 0.044 m3/s. For these head and capacity of turbine, rotational speed is 1000 rpm, pitch circle diameter is 0.15 m and jet diameter is 0.058 m. The number of buckets based on jet ratio 3 are 17.

Moreover, we are also looking forward to design a module that would take fuel (water) and recirculate it. This module would also be helpful in urban households power generation.

Project Objectives

Electricity is one of the greatest crisis in our country. To overcome this catastrophe, we must direct our attentions towards natural, renewable and a cleaner souce of electricity. The main objective of our Final Year Project is to generate electricity for atleast one household from natural streams of waterfall. The objective currently is to design for a smaller scale. We can scale it up for various objectives. 

We are also motivated to design our module suitable for urban areas and areas where water head is not always available.

Project Implementation Method

Firstly, we will study related literatures and researches for broader understanding of our project. We will shorlist related literatures and projects.

Secondly, we will be finding out the different components of our project available in our country (i.e. Generators, turbines etc).

Thirdly, calculations will be carried out according to our design requirements. We will be calculating our design values on MS Excel to avail design values when requirement changes.

Fourthly, the model will be designed on CREO Software according to the values obtained. We will also be analyzing our model on ANSYS for various parameters. 

Next, we will be fabricating our model. This model will be on a smaller scale for testing purposes. We can then scale up the model for bigger desired requirements.

Lastly, we will present our model, project, analysis and our sheer dedicated hard work to out supervisors, professors, peers and batchmates. Our goal is to showcase our model on a greater level rather than limiting it to our degree course.

Benefits of the Project

Several inherent advantages have been mentioned for hydro-power generation including,

  1. Simplicity of its technology, which is available and only requires adaptation to specific conditions in order to reduce costs.
  2. Viability as a means of providing electricity, particularly in rural and isolated areas, without any need for imported fuel supply.
  3. Contribution to the promotion of industrial, socio-economic and cultural development of the rural environment.
  4. The long lifetime of the structure and machinery, requirements in the locality.
  5. Adaptability of scale designed for specific user requirements in the locality.
  6. Compatibility with the use of water for other purposes such as irrigation and drinking water supply, thereby improving investment.
  7. A supplement to the regional or national grid.

Technical Details of Final Deliverable

  • Mini Pelton Wheel Turbine for power generator for rural or isolated areas with natural streams of water but no electricity source. 
  • To provide free electricity to rural households. 
  • Power Generation.

Final Deliverable of the Project

Hardware System

Core Industry

Energy

Other Industries

Education , Manufacturing

Core Technology

Clean Tech

Other Technologies

Shared Economy

Sustainable Development Goals

No Poverty, Good Health and Well-Being for People, Quality Education, Affordable and Clean Energy, Decent Work and Economic Growth, Industry, Innovation and Infrastructure, Sustainable Cities and Communities, Responsible Consumption and Production

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Generator Equipment12000020000
Pelton wheel manufacturing Equipment13000030000
Electrical power circuit modules Equipment12000020000
Total in (Rs) 70000
If you need this project, please contact me on contact@adikhanofficial.com
0
159
Garbage Sorting Machine

Pakistan generates about 40.5 million loads of solid waste a year which has been incr...

1675638330.png
Adil Khan
1 year ago
Resorting app

Countries all around the world are looking for a fresh approach to provide tourists and th...

1675638330.png
Adil Khan
1 year ago
Calculator Html

defaultuser.png
Faseeh Iftikhar
7 years ago
Formation Control of Multiple UAVs

This project deals with the formation control of multiple unmanned aerial vehicles (UAVs)....

1675638330.png
Adil Khan
1 year ago
Design and Implementation of Artificial Human Arm Driven by EMG Signal

Everything is possible in this technological age. We may make a new product simply by comb...

1675638330.png
Adil Khan
1 year ago