CARRIER AIDED PROTECTION OF TRANSMISSION LINES THROUGH DIFFERENTIAL SCHEME

Transmission lines are a vital part of the electrical power system, as they provide the path to transfer power from generation to load. In Pakistan, transmission line operating voltages are; 132kV, 220kV and 500kV. These are interconnected and requires reliable operation. Re

Project Title

CARRIER AIDED PROTECTION OF TRANSMISSION LINES THROUGH DIFFERENTIAL SCHEME

Project Area of Specialization

Electrical/Electronic Engineering

Project Summary

Transmission lines are a vital part of the electrical power system, as they provide the path to transfer power from generation to load. In Pakistan, transmission line operating voltages are; 132kV, 220kV and 500kV. These are interconnected and requires reliable operation. Reliability of a transmission system mainly depends on the protection system. Transmission protection systems are designed to identify the location of faults and isolate only the faulted section . The key challenge to the transmission line protection lies in reliably detecting and isolating faults compromising the security of the system.

In our project we are using the differential protection scheme in which we operate the circuit breaker on the basis of impedance comparision of different zones. The key operation is the communication between the controllers of different zones and commanding the relay in case of any fault.

Project Objectives

Following are the objectives of project:

  • Designing Protection scheme for the transmission lines.
  • Implementation of different types of fault to counter them.
  • Achieving accuracy in detection of fault and it's timely clearance.
  • To improve the Relays' delay and calibration for quick action in case of surge. 
  • Zonal relays coordination through wireless communication.

Project Implementation Method

Project Implementation is performed in following steps:

  • Submitted the project proposal.
  • Made the schematic diagram.
  • Componants purchase and their testing.
  • Implementation of single phase operation of relay.
  • Case study of the delay calibration.
  • Implementation of the three phase relay coordination.
  • Detection of type and location of fault.
  • Wireless communication between controllers.
  • Decision making on the basis of impedance ratio.
  • Display it on lcd through master controller.

Benefits of the Project

Benefits of the project are the given below:

  • Complication are reduced by using wires communication medium.
  • Fault detection and communication is faster.
  • Protection system fault is reduced.
  • Pretection of power system components be improved.
  • Maintence of wireless system is easier as compared to wired system.
  • Data login for online switching and maintence.

Technical Details of Final Deliverable

The final project will contain the following features

  • Types of fault like three phase fault , line to ground. 
  • The location of fault in which is occured.
  • In which zone the fault is occured.
  • Tripping of relays on the basis of difference impedance values.
  • Delay calibrated isloation of faults from the healty system.
  • Wireless communication between controllers.

Final Deliverable of the Project

HW/SW integrated system

Core Industry

Energy

Other Industries

Manufacturing , Others , Telecommunication

Core Technology

Internet of Things (IoT)

Other Technologies

Cloud Infrastructure, Others

Sustainable Development Goals

Industry, Innovation and Infrastructure, Responsible Consumption and Production

Required Resources

Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
4 Channel 5V DC Relay Module Equipment33501050
Current Sensor ACS712 20A Equipment97506750
Step Down Transformer 220/6 V Equipment33501050
Arduino UNO Equipment38002400
Arduino MEGA Equipment113501350
ESP8266 Equipment45002000
LCD 20x4 Equipment1500500
Bulb Holder Equipment1250600
100W Philips bulb Equipment121001200
Resistors Equipment505250
Capacitor Equipment5100500
Bridge Rectifier Equipment550250
Vero board Equipment3200600
PCB Equipment510005000
Block Connector Equipment2030600
3/29 Cable Equipment2035700
30A Switch Equipment121001200
PVC Duct 2 inch Equipment2100200
Hard board 6x4 Equipment125002500
Colour Print Miscellaneous 25401000
B/W Print Miscellaneous 7010700
Stationary Miscellaneous 133003300
Transport Miscellaneous 315004500
Tool Box Equipment150005000
Total in (Rs) 43200
If you need this project, please contact me on contact@adikhanofficial.com
0
120
Hexapod robot for uneven terrain

The aim of this project is to design a six legged robot for uneven terrain. As wheeled rob...

1675638330.png
Adil Khan
1 year ago
Hand Writing Recognition

The recognition of handwritten text is one of the most difficult problems in the field of...

1675638330.png
Adil Khan
1 year ago
EasyCeph

Cephalometric analysis is the analysis of the dental and skeletal relationships of a human...

1675638330.png
Adil Khan
1 year ago
ASIPS

A-SIPS will project and pinpoint where plantation can be done.This will help out people wh...