Automation of Handlooms Shuttle

The main concern for our project is to automate the weft thread mechanism of handloom. This can be done by placing two electromagnets (solenoid) that will generate an Electromotive force to move the wooden piece (shuttle) across the (? 4 feet) lay. Solenoid coil will be designed according to the

2025-06-28 16:30:30 - Adil Khan

Project Title

Automation of Handlooms Shuttle

Project Area of Specialization Electrical/Electronic EngineeringProject Summary

The main concern for our project is to automate the weft thread mechanism of handloom.
This can be done by placing two electromagnets (solenoid) that will generate an Electromotive force to move the wooden piece (shuttle) across the (? 4 feet) lay. Solenoid coil will be designed according to the weight of the shuttle i.e. the force required to move it and length of the lay.
Using sensors, we will be determining the position of shuttle on the lay. This mechanism can be fully automated using time delays but we will make it semi-automatic i.e. by using a push button.

Project Objectives

Automating handloom’s shuttle module to save time and increase productivity by reducing the manual work of beating shuttle.

Project Implementation Method

Employing hardware and PCB circuitry to automate the shuttle timing and motion that will make picking (insertion of shuttle between longitudinal threads) process less laborious.

Benefits of the Project

• To automate handloom’s shuttle in order to help the small scale textile industry of Pakistan.
• To reduce the work of beating the shuttle.
• To synchronize the timing of picking and shedding.

Technical Details of Final Deliverable

The previously hand operated shuttle picking in R&D lab of IST will now allow the shuttle to move across the (? 4 feet) lay, on the push of a button after sensing its current position.

Final Deliverable of the Project HW/SW integrated systemCore Industry ManufacturingOther IndustriesCore Technology Wearables and ImplantablesOther TechnologiesSustainable Development Goals No Poverty, Good Health and Well-Being for People, Decent Work and Economic Growth, Industry, Innovation and Infrastructure, Responsible Consumption and ProductionRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 22700
Mild Steel Rod Equipment245009000
Enamel Winding Wire Roll Equipment115001500
Cylindrical Bobbin Equipment450200
Microcontroller Equipment210002000
12V car's battery Equipment140004000
BreadBoard Equipment1200200
PCB Equipment210002000
Position Sensor Equipment4200800
Misc. Equipment103003000

More Posts