Project Title

Automated meter reading system

Project Area of Specialization Computer ScienceProject Summary

In Pakistan there is a manual electric meter reading system in which the electric providing company have haired hundreds of employees that go door to door and meter to meter to note down the meter reading and then submit it to the office. Then afterwards the bill is generated from the office. The system is slow and time taking. Usually it takes days to collect readings of big villages or a city. We want to make a system that will be placed in the meter that will send the readings to the office automatically. So, it will take less time to get more readings and a smaller number of employees will be required. As it is a complete automated system so it will be more efficient and it will have less room of errors

Project Objectives Project Implementation Method

We are using the arduino uno, a sim 900 gsm module and sensor to collect data. We are using the gsm technology to transport it 
                                             

Benefits of the Project Technical Details of Final Deliverable

An  arduino uno will be used which will get data from the sensor (ACS712) and then count the units. These units will be the converted into the string form and will be passed to the gsm module. The gsm module will take the string which contain the units and will send it to the receiver side/ application as a text message. Our android application will then process the message received and then take data from it. Then the app will store the data on the cloud servers(firebase) and calculate the bill of the user. There will be a login functionality to differentiate the roles of the consumer and the company administrator. the company administrator can add or remove the connections and change the price of the units. The consumer can only see the units consumed.

Final Deliverable of the Project HW/SW integrated systemCore Industry Energy Other IndustriesCore Technology OthersOther TechnologiesSustainable Development Goals Quality Education, Affordable and Clean Energy, Reduced InequalityRequired Resources
Item Name Type No. of Units Per Unit Cost (in Rs) Total (in Rs)
Total in (Rs) 10000
ARDUINO UNO R3 Equipment1700700
SIM 900 GSM MODULE Equipment115001500
ACS712 SENSOR Equipment1400400
MOBILE SIM Equipment1100100
WIRES Equipment520100
ANDROID APPLICATION Miscellaneous 172007200