Auto Power Supply Control System from four different sources to ensure no break power
The main objective of this project is to provide in the power system transformers may be loaded beyond their nameplate ratings due to a fault or some emergency conditions. This type of overloading can cause either short term failures or long term failures. Increase in hot spot temperature would also
2025-06-28 16:25:12 - Adil Khan
Auto Power Supply Control System from four different sources to ensure no break power
Project Area of Specialization Electrical/Electronic EngineeringProject SummaryThe main objective of this project is to provide in the power system transformers may be loaded beyond their nameplate ratings due to a fault or some emergency conditions. This type of overloading can cause either short term failures or long term failures. Increase in hot spot temperature would also lead to the accelerated ageing of the transformers resulting in transformer overload. So in order to keep the body temperature of the transformer within its nameplate rating, the transformer must be loaded efficiently in a controlled manner
Project ObjectivesWe decided to make an electrical system which solve these issue to ensure continuous supply under over load condition by load sharing.
Thus by the sharing load on transformer the transformer is protected .This will be done by connecting another transformer in parallelThe benefit of the project is to solve this issue to ensure continuous supply under over load condition by load sharing
Project Implementation MethodThe benefit of the project is to solve this issue to ensure continuous supply under over load condition by load sharing
Benefits of the ProjectThe benefit of the project is to solve this issue to ensure continuous supply under over load condition by load sharing
Technical Details of Final Deliverabledecided to make an electrical system which solve these issue to ensure continuous supply under over load condition by load sharing.
Thus by the sharing load on transformer the transformer is protected .This will be done by connecting another transformer in parallelThe benefit of the project is to solve this issue to ensure continuous supply under over load condition by load sharing
Final Deliverable of the Project Hardware SystemCore Industry EducationOther IndustriesCore Technology Wearables and ImplantablesOther Technologies Others, Big DataSustainable Development Goals Gender EqualityRequired Resources| Item Name | Type | No. of Units | Per Unit Cost (in Rs) | Total (in Rs) |
|---|---|---|---|---|
| Total in (Rs) | 43780 | |||
| transformer 10A | Equipment | 2 | 7000 | 14000 |
| aurdino uno | Equipment | 1 | 1500 | 1500 |
| 5v relay | Equipment | 1 | 800 | 800 |
| LCD Display16*2 | Equipment | 1 | 230 | 230 |
| Hall effect sensor | Equipment | 1 | 1200 | 1200 |
| Potentiometer | Equipment | 1 | 50 | 50 |
| Circuit breaker | Equipment | 2 | 5000 | 10000 |
| resistor | Equipment | 4 | 4000 | 16000 |